IT
ALIANO
ENGLISH
8
IOMMASGPXX01-GB_01
10-40 kVA
UNPACKING AND INSTALLATION
OF THE UNIT
3
The packaging guarantees the stability of the UPS during shipping and physical transfer. Carry the packaged unit as
close as possible to the installation site.
When moving the unit on even slightly sloping surfaces, use the blocking equipment and break-
ing devices to ensure that the unit does not fall over.
3.1 SHIPPING AND MOVING.
r 5IF614NVTUSFNBJOJOBWFSUJDBMQPTJUJPOEVSJOHBMMTIJQQJOHBOENPWJOHPQFSBUJPOT
r 5IFVOJUIBTXIFFMTUIBUDBOCFVTFEUPNPWFJUGPSTIPSUEJTUBODFT
r &OTVSFUIBUUIFóPPSJTTUSPOHFOPVHIUPTVQQPSUUIFXFJHIUPGUIF614BOEPGUIFCBUUFSZDBCJOFUJGVTFE
Avoid pressing on the front panels when moving the unit.
The UPS MUST only be moved by two people at least. The people MUST take position at the
sides of the UPS with respect to the direction of movement.
CAUTION IF DAMAGED.
BATTERIES, NON SPILLABLE.
Packages, crushed, punctured, or torn such that contents are revealed
must
be set aside in an isolated area and inspected by a qualified per-
son. If the package is deemed to be not shippable, the contents
must
be promptly collected, segregated, and either the consignor or consignee
contacted.
All packaging material must be recycled in compliance with the laws in force in the country where
the system is installed.
Battery is NOT connected!
Содержание Masterys Green Power
Страница 1: ...INSTALLATION AND OPERATING MANUAL IOMMASGPXX01 GB_01 10 40 kVA...
Страница 2: ...ITALIANO...
Страница 62: ......