IT
ALIANO
ENGLISH
16
IOMMASGPXX01-GB_01
10-40 kVA
3
UNPACKING AND INSTALLATION
OF THE UNIT
EXT. BATTERY
OUTPUT
MAINS SUPPLY
L12 L22 L32 N2
L11 L1 L21 L2 L31 L3 N11 N1
+B2 -B2 -B1 +B1
OUTPUT
AUX
MAINS
L12
L22
L32
N2
L11
L21
L31
N11
MAINS
N1
L3
L2
L1
EXT. BA
TPUT
MAINS SUPPLY
2 L32 N2
L11 L1 L21 L2 L31 L3 N11 N1
+B2 -B2
3/3
Connections
if
THE MAINS AND AUX MAINS ARE CONNECTED SEPARATELY
Содержание Masterys Green Power
Страница 1: ...INSTALLATION AND OPERATING MANUAL IOMMASGPXX01 GB_01 10 40 kVA...
Страница 2: ...ITALIANO...
Страница 62: ......