IT
ALIANO
ENGLISH
18
IOMMASGPXX01-GB_01
10-40 kVA
3
UNPACKING AND INSTALLATION
OF THE UNIT
3.5-7
A. Power cables
B. Control cables
3.5-6
3.5-3
3.5-4
20 cm
90°
N1
+B2 -B2 -B1 +B1
EXT. BATTERY
Y
A
C
B
D
E
E
A
A
B
B
3.5-3
Divert any control cables from the front (RS232, signalling relay contacts, etc.) into the appropriate side
cable run
A
.
3.5-4
Remove the pre-cut detail
C
and bend details
B
to pass the cables, secure the terminal board cover with the
four screws.
3.5-5
Secure the cables to the couplings
D
located on the rack ensuring that the air vents are not obstructed in
any way.
3.5-6
0ODFUIFDBCMJOHIBTCFFODBSSJFEPVUTFDVSFUIF614XJUIUIFöYJOHGFFU
E
3.5-7
NOTE.
*GUIFTZTUFNJTJOTUBMMFEPOBSBJTFEóPPS TVDIBTJOBEBUBQSPDFTTJOHSPPN
r MFBWFBTQBDFPGBUMFBTUDNCFUXFFOUIFQPXFSBOEUIFDPOUSPMDBCMFT
r BWPJEQBSBMMFMDIBOOFMMJOHPWFSMPOHEJTUBODFTDIPPTFDBCMFTDSPTTJOHBUJOTUFBE
3.5-5
Содержание Masterys Green Power
Страница 1: ...INSTALLATION AND OPERATING MANUAL IOMMASGPXX01 GB_01 10 40 kVA...
Страница 2: ...ITALIANO...
Страница 62: ......