- Ref.: INMGP2601410-GB_12
X5
L3
X4
X1
X40
X20
-
X20 +
X50
X10
L1
L2
L3
N
L1
L2
L3
N
N
N
L1
L1
L2
L3
L1
L2
L3
L1
L2
L2
L3
8.1-2
8.9-1
Battery String
for safety reasons during transports and handling,
batteries are disconnected at the level of each rack
(or by sections not exceeding 150 v).
take all necessary precautions when reconnecting
the cables.
connection must be performed by authorised staff,
which have been previously trained. connections to
be performed are :
- grounding of battery cabinet,
- pola and – to the inverter,
- between battery sections and/or between
shelves.
8. 9. e
xternal
battery
cabInet
connectIon
Before carrying out any operation, ensure that:
• the battery fuses located inside the battery cabinet are open;
• Green Power 2.0 is not live and all mains or battery switches are open;
• the switches upstream of Green Power 2.0 are open.
use double insulated cables or the cables supplied with the unit to connect green power 2.0 to the
Battery cabinet.
cabling errors with inversion of the battery polarity may cause permanent damage to the equipment.
if using cabinets not supplied by the manufacturers of green power 2.0, it is the installer’s responsibility
to check the electrical compatibility and the presence of appropriate protection devices between green
power 2.0 and the battery cabinet (fuses and switches of sufficient capacity to protect the cables from
green power 2.0 to the battery cabinet). as soon as green power 2.0 is switched on (before closing the
battery switches) the battery parameters must be verified accordingly (voltage, capacity, number of ele-
ments, ...) on the mimic panel menu.
IMPorTanT:
before closing the battery protection, be sure that the rectifier is
started !
see the pictogram
: the bar must be green.
8.
Battery