4. 5.5. Neutral cable cross-section
It is necessary to check:
a) the minimum cross-section of the neutral cable must equal one of the phase conductors.
b) the balancing of the loads across the three phases,
c) the values that will trip the protective devices.
4. 6. v
alues
of
currents
for
cable
sIzIng
NOTE : these values are only indicative for standard systems.
4. 6.1. Input rectifier currents for Green Power 2.0
Operating conditions are as follows:
•
Input/output power supply voltage 3 x 400V,
•
Green Power 2.0 is operating at rated power and batteries are recharging.
PoWer on UPs output
600 kVa / 600 kW
Max. rectifier input current*
1020 A
* Regardless of the conditions (battery recharge, overload, voltage...)
4. 6.2. Mean current supplied by the battery when discharging
The mean current value is to be taken into account for sizing connecting cables between the battery and Green Power 2.0.
Green Power 2.0 Power
600 kVa / 600 kW
currents
1565
4. 6.3. Bypass current
(or output current to the load)
Operating conditions are as follows:
•
Input/output power supply voltage 3 x 400V, for 415V, the current value must be multiplied by 0.96
•
Green Power 2.0 is operating at rated power.
UPs
bypass
Power kVa
600
800
1200
2000
2400
currents (a)
866
1155
1732
2887
3464
Note: sizing of cables and protections upstream of the bypass shall take into account:
•
overloads caused by non-linear loads,
•
possible overloads admitted by Green Power 2.0 i.e.(400V / 50Hz, 27°C):
UPs (kVa)
600
1 hour
110 %
10 minutes
125 %
1 minute
150 %