8.
Battery
8. 7. c
onnectIng
the
battery
cabInet
temperature
probe
Battery cabinets on rack:
•
Use the specific kit available with the UPS.
•
Fix the probe in the battery room or inside the battery cabinet.
•
Connect the temperature probe without cabling distance limits and without the need to observe polarity, by
using a 2x1 mm² double isolation cable, XB5 1-2 (see § 7.7 Terminals).
•
In the event of a single UPS with several battery cabinets, use a single temperature sensor.
•
In the event of parallel UPSs, connect the battery cabinet temperature sensors to the cards installed in the
related UPSs.
8. 6-1
1
2
3
8. 6-4
8. 6-5
8. 6-2
8. 6-3
8. 6. b
attery
cabInet
InstallatIon
Each battery cabinet has two side reinforcement bars. After unloading, they must be removed to ensure proper
ventilation of battery blocks. If the cabinet is provided with side panels, they shall be removed first.
For advice regarding safety, fixing to the floor of the cabinets and adjusting of fastening rods, please see §
8. 5.
aSSeMBle
reMove
reMove
reMove
to keep in
case of future
movement of
cabinet
to keep in
case of future
movement of
cabinet
open