
●
All manufacturers operating instructions and
safety rules and all employers safety rules
and all OSHA and other government or local
authority safety rules should be strictly
adhered to.
●
Repairs and adjustments should be made
only by qualified and trained maintenance
personnel.
●
No modification should be made to the
equipment without prior written consent of
the Snorkel Engineering Department.
●
Make a pre-start inspection of the MHP at
the beginning of each shift. A malfunctioning
machine must not be used.
●
Make an inspection of the work place to
locate possible hazards before operating the
MHP.
■
Additional Information
For ad di tional in for ma tion, con tact your lo cal
dealer or Snor kel at:
Snor kel In ter na tional,
PO Box 1041
Levin 5510
New Zea land
MHP15/44HD – 12885A
Rev F
page - v
Introduction