Grouting Procedure (Optional)
1. Pour grouting under the load area of each base frame as shown in
Figure 21
. Ensure that grout
is evenly distributed under the frame and finish the edges with a 45 degree chamfer. Refer to
specific grouting instructions on the package. Leave a drain area to allow any liquids to escape.
2. GROUTING MUST FULLY CURE BEFORE PROCEEDING. Do not operate the lift while grout is
curing. Refer to instructions on the package for recommended cure times. [Non-Shrink Grout
(3000psi min. in 24hrs, 7000psi min. in 30 days)]
Figure 21 - Grouting Locations
Содержание EELR501A
Страница 6: ...6 of 73 2 0 SAFETY WARNING DECALS...
Страница 8: ...8 of 73 Figure 2 Lift Dimensions Side View Figure 3 Lift Dimensions Back View...
Страница 18: ...18 of 73 Figure 12 Hydraulic Connections...
Страница 33: ...33 of 73 Figure 31 Connection of Air Recoil Hose...
Страница 61: ...61 of 73 16 0 HYDRAULIC AND AIR LINE ASSEMBLY 16 1 Hydraulic Line Routing Map Figure 51 Hydraulic Items Map...
Страница 64: ...64 of 73 16 6 Air Line Routing Map Figure 53 Air Hose Assembly...
Страница 69: ...69 of 73 17 5 Console Labeling Figure 57 Console Labeling...
Страница 74: ...74 of 73 APPENDIX Foundation Plan...