12 of 73
7.2
Base frame Location
Figure 5 – Base frame Locations
IMPORTANT: DO NOT CUT THE SHIPPING
STRAPS HOLDING EACH SCISSOR
ASSEMBLY
TOGETHER
UNTIL
INSTRUCTED TO DO SO.
1.
With reference to
Figure 4
, the installer
should determine the most suitable
location in the bay for the lift.
2.
Snap a chalk line for the centerline of the
lift ensuring that it matches the centerline
of the bay door.
3.
Measure and snap two (2) parallel chalk
lines on either side of the centerline for the
inside edges of the base frames. Refer to
Figure 5
for the dimensions necessary to
provide the desired width between the two
runways. A distance of 42-1/4" (1073mm)
between the inside edges of the base
frames will provide the standard width of
40-1/2” (1028mm) between the inside of
the runways, shown on
Figure 4
.
4.
Measure and snap a chalk line parallel to
the shop door for the front of the base
frames, a minimum distance of 262- 3/8"
(6675mm) is recommended.
5.
Before proceeding, ensure that once the
runways are installed adequate workspace
will remain in front of the lift. Refer to the
minimum requirements listed in the
installation and operation manual of any
alignment equipment as needed.
Note:
The chalk lines are for reference only.
Refer to the minimum requirements listed in the installation and operation manual
of any alignment equipment as needed.
Содержание EELR501A
Страница 6: ...6 of 73 2 0 SAFETY WARNING DECALS...
Страница 8: ...8 of 73 Figure 2 Lift Dimensions Side View Figure 3 Lift Dimensions Back View...
Страница 18: ...18 of 73 Figure 12 Hydraulic Connections...
Страница 33: ...33 of 73 Figure 31 Connection of Air Recoil Hose...
Страница 61: ...61 of 73 16 0 HYDRAULIC AND AIR LINE ASSEMBLY 16 1 Hydraulic Line Routing Map Figure 51 Hydraulic Items Map...
Страница 64: ...64 of 73 16 6 Air Line Routing Map Figure 53 Air Hose Assembly...
Страница 69: ...69 of 73 17 5 Console Labeling Figure 57 Console Labeling...
Страница 74: ...74 of 73 APPENDIX Foundation Plan...