SERIES 28RTS/HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS

The bottom opening must be within 12 in.305 mm 
of, but not less than 3 in.76 mm from, the bottom of the 
enclosure.

All Air From Outside The Building
When installed in a confi ned space two permanent 
openings communicating directly with, or by ducts to, 
the outdoors or spaces that freely communicate with 
the outdoors must be present. The upper opening must 
be within 12 in.,  305 mm of, but not less than 3 in.
76 mm from, the top of the enclosure. The bottom 
opening must be within 12 in.305 mm of, but not less 
than 3 in.76 mm from, the bottom of the enclosure.

Where directly communicating with the outdoors or 
communicating with the outdoors through vertical ducts, 
each opening shall have a minimum free area of 
1 in

2

/4000 Btu/hr, 35 in

2

/GPH550 mm

2

/kW of the total 

input rating of all of the equipment in the enclosure.

Where communicating with the outdoors through 
horizontal ducts, each opening shall have a minimum 
free area of 1 in

2

/2000 Btu/hr70 in

2

/GPH1100 mm

2

kW of the total input rating of all of the equipment in the 
enclosure. When ducts are used, they must have the 
same cross-sectional area as the free area of the 
opening to which they connect. When calculating the 
free area necessar y to meet the make-up air 
requirements of the enclosure, consideration must be 
given to the blockage effects of louvers, grills and 
screens. Screens must have a minimum mesh size of 
1/4 in6.4mm. If the free area through a louver or grill 
is not known the louver or grille should be sized per 
Table 1.

Table 1 - Make-up Air Louver Sizing

         Required Cross Sectional Louver Area (in

2

)   

  

 

Metal 

Wooden

  Input 

1/4", 6.4 mm 

 Louvers 

Louvers

 (MBH) 

Wire Screen 

75% Free Area         25% Free Area

 

 

  in

2

 

  cm

2

 

in

2

 

cm

2

 

in

2

 

cm

2

 1000 

  250      1613  

  333          2148 

1000          6452

 1200 

  300      1936         400          2578 

1200          7742

 1400 

  350      2258  

 

467          3007 

1400          9033 

 1600 

  400      2581  

 

533          3437 

1600   

10,323

 1800 

  450      2903  

 

600          3866 

1800   

11,614

 2000 

  500  

3226  

 

666 

   4296 

2000 

12,904 

 2200 

  550 

3549  

 

733 

   4726 2200 14,194

 2400 

  600 

3871  

 

800 

   5155 

2400 

15,485

 2600 

  650 

4194  

 

867 

   5585 

2600 

16,775

 2800 

  700 

4516  

 

934 

   6014 

2800 

18,066

 3000 

  750 

4838 

1000 

   6452 

3000 

19,354

 3200 

  800 

5162 

1066 

   6874 

3200 

20,646 

 3400 

  850 

5484 

1134 

   7303 

3400 

21,937

 3600 

  900 

5807 

1200 

   7733 

3600 

23,227

 3800 

  950 

6129 

1267 

   8162 

3800  

24,518 

 4000 

1000 

6452 

1334 

   8592 

4000 

25,808

 4200 

1050 

6775 

1400 

   9022 

4200 

27,098

 4400 

1100 

7097 

1467 

   9451 

4400 

28,389

 4600 

1150 

7420 

1533 

   9881 

4600 

29,679

 4800 

1200 

7742 

1600 

10,310 

4800 

30,970

COMBUSTION AIR & VENTILATION

WARNING: This boiler must be supplied with 
combustion and ventilation air in accordance 
with the latest revision of Section 5.3, Air for 
Combustion & Ventilation, of the National Fuel 
Gas Code, ANSI Z223.1/NFPA 54 for gas boilers 
or ANSI/NFPA 31 Installation of Oil Burning 
Equipment for oil boilers. Canadian installations 
must comply with CAN/CSA B149.1 Natural Gas 
and Propane Installation Code for gas boilers 
or CSA B140.7 Oil Burning Equipment for oil 
boilers. All applicable local building codes 
must be adhered to. Failure to provide adequate 
combustion air for this boiler can result in 
excessive levels of carbon monoxide which can 
result in severe personal injury or death!

To operate properly and safely this boiler requires a 
continuous supply of air for combustion. An adequate 
supply of air must be available to replace the air used 
by the combustion process. NEVER store objects on or 
around the boiler.

CAUTION: Never use an exhaust fan in the boiler 
room. The boiler room must never be under a 
negative pressure or improper burner operation will 
occur!

NOTE: Forced make-up air supplied to the boiler 
room must be approved by the local authorities. 
A minimum of 30 ft

3

/GAL,  0.22 m

3

/L for oil or 

25 ft

3

/100 MBH (Therm), 0.024 m

3

/kW for gas must be 

provided.

All Air From Inside The Buidling
If the boiler is to be located in a confi ned space mini-
mum clearances of 24 in.610 mm must be maintained 
between the boiler and any adjacent construction. 
When installed in a confi ned space, two permanent 
openings communicating with an additional room(s) 
are required. The combined volume of these spaces 
must have suffi cient volume to meet the criteria for an 
unconfi ned space. The total air requirements of all fuel 
burning equipment or any type of exhaust fan must be 
considered when making this determination.

Each opening must have a minimum free area of 
1 in

2

/1000 Btu/hr, 140 in

2

/GPH2200 mm

2

/kW based 

on the total input rating of ALL fuel burning equipment 
in the confi ned area. Each opening must be no less than 
100 in

2

64,516 mm

2

 in size. The upper opening must be 

within 12 in.305 mm of, but not less than 3 in.76 mm 
from, the top of the enclosure.

Содержание SERIES 28RTS/HE

Страница 1: ...ier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier WESTCAST INC 260 NORTH ELM STREET WESTFIELD MA 01085 TEL 413 562 963...

Страница 2: ...assembled block or as complete factory assembled packaged boilers All boiler components should be inspected for damage upon receipt Any damage should be immediately reported to the trucker or wholesa...

Страница 3: ...nsive property damage severe personal injury or death BOILER RATINGS CAPACITIES Before undertaking the installation of the RTS Series boiler check the boiler rating plate to ensure that the boiler has...

Страница 4: ...200 7733 3600 23 227 3800 950 6129 1267 8162 3800 24 518 4000 1000 6452 1334 8592 4000 25 808 4200 1050 6775 1400 9022 4200 27 098 4400 1100 7097 1467 9451 4400 28 389 4600 1150 7420 1533 9881 4600 29...

Страница 5: ...spection of the chimney must be performed Ensure that the chimney is clean properly constructed lined and properly sized see Figure 2 Table 2 lists the equivalent breeching and flue sizes required for...

Страница 6: ...the boiler s smoke hood This includes the removal or alteration of any baffles Never install a vent pipe of a diameter smaller than that of the boiler smoke hood outlet Failure to comply with this wa...

Страница 7: ...n ensuite d terminer si le coupetirage d borde l ouverture de d charge Utiliser la flamme d une allunette ou d une chandelle ou la fum e d une cigarette d un cigare ou d une pipe Always provide a mini...

Страница 8: ...31 Installation of Oil Burning Equipment for oil burners Si la grosseur d une section du syst me d vacuation doit tr modifi e le syst me devrait tr modifi pour respecter les valeurs minimales des tabl...

Страница 9: ...Never leak test the boiler using compressed air Failure to comply with this warning may result in property damage severe personal injury or death 1 Plug all openings in the boiler and fill it with wat...

Страница 10: ...on draw rod and washer coating thread and washer on one end only Torque the draw rods from the end with anti seize washer Follow the steps as described below Do not completely tighten one side gradua...

Страница 11: ...efficiency 28RTS HE comes with design certified heat transfer rod sets Each tube of 15 heat transfer rods will baffle one flue In order to obtain the high efficiency for which the boiler was designed...

Страница 12: ...ut cover and tighten the nuts to 15 ft lbs 21 Nm 6 Apply a bead of high temperature silicone caulk around the perimeter of the cleanout cover to ensure an air tight seal Figure 10 Cleanout Cover Assem...

Страница 13: ...xpansion pin item 7 through the hinge bosses to secure the door to the cover 3 Insert the hex bolt item 6 through the hole in the observation port cover 4 Install the spring nut and knob items 3 2 1 o...

Страница 14: ...mokehood Installation Figure 13 1 Screw the four 5 16 18 x 1 1 2 in studs into the tapped holes around the smokehood opening in the back section 2 Apply smokehood insulation tape to smokehood 3 Place...

Страница 15: ...arrangement for multiple heaters Burner Mounting 1 Clean the burner mounting flange to remove any rust or debris 2 Install the four 3 8 in x 1 1 4 in studs into the tapped holes in the burner mounting...

Страница 16: ...Never use automotive antifreeze in the boiler or heating system If antifreeze is necessary it must be formulated specifically for hydronic heating systems such as ethylene or propylene glycol Failure...

Страница 17: ...nstallation NOTE Install the smoke hood before proceeding 1 Install 3 in x 4 in NPT bushings in the two 4 in NPT tappings at the bottom of the back section Install two 3 in NPT x 3 in nipples with bal...

Страница 18: ...gure 21 RTS Installation Figure 23 RTS Installed IMPORTANT NOTE A removable elbow or section of pipe must be attached to the Back Section return port to allow for RTS removal should maintenance be req...

Страница 19: ...sonal injury or death Control Installation Locate the temperature pressure gage low water cutoff high limit and operating controls per Figures 17 24 and Table 5 Optional controls must be installed in...

Страница 20: ...TE Some locations do not allow this solution to be used Check with the local authority having jurisdiction 4 Mix the cleaning chemicals with water to create a concentrated solution Pour the cleaning s...

Страница 21: ...maximum trace of smoke The flue gas samples should be taken at the smoke hood Confirm proper burner adjustment with a calibrated combustion analyzer BURNER INSTALLATION WARNING The burner must be ins...

Страница 22: ...ver exceed the maximum set point of 240 F 116 C The aquastat high limit cannot be repaired If it fails to function properly replace it CAUTION If the flue gas temperature exiting the smoke hood is les...

Страница 23: ...ulation and rope seal If damaged or deteriorated replace them 10 Install the clean out covers and reseal them with a silicone caulk rated for 500 F 260 C 11 Install the left jacket panels and remount...

Страница 24: ...Page 24 SERIES 28RTS HE BOILER INSTALLATION AND OPERATION INSTRUCTIONS Figure 25 Boiler Assembly SIOM 161 Rev 1...

Страница 25: ...let Increaser 16 to 18 69904 1 1 Smoke Hood Assembly 10 70633 1 1 1 16 1 Smoke Hood Assembly 12 70611 1 1 Smoke Hood Assembly 14 70612 1 1 1 1 1 Smoke Hood Assembly 16 70613 1 1 1 1 1 16a Smokehood in...

Страница 26: ...nsulating Block 69645 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 34 Burner Mounting Plate Rope Seal 1 4 x 7 60026 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 n s Can of Spray Adhesive 70492 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 n s Flu...

Страница 27: ...nting system pipes or chimney escaping into the living space Flames coming out around the appliance Yellow colored flames in the appliance Stale or smelly air The presence of soot or carbon in or arou...

Страница 28: ...WESTCAST INC 260 NORTH ELM STREET WESTFIELD MA 01085 TEL 413 562 9631 FAX 413 562 3799 In Canada 7555 Tranmere Drive Mississauga Ont L5S 1L4 905 670 5888 Fax 905 670 5782...

Отзывы: