
7
1.
Assemble the 3° cut block connector and tibial spiked
fixation rod to the extramedullary tibial alignment guide
and ankle clamp (Figure 9).
2.
Connect the universal cutting block to the 3° cut block
connector with the “T” mark facing outwards. This can
be attached either centrally or medially depending
on preference.
3.
Place the ankle clamp around the patient’s ankle
distally, and proximally impact the posterior spike of the
tibial spiked fixation rod into the ACL footprint to secure
assembly (Figure 10).
Tibial preparation
Figure 9
Figure 10
Содержание Syncera Anthem
Страница 1: ...Surgical Technique...