
a
b
c
4
1.
Open the femoral canal with the 9.5mm intramedullary
drill. The drill has a 12mm step to open the entry point
further (Figure 1).
2.
Assemble the valgus alignment guide with the valgus
bushing (5°,6° or 7°) Right or Left mark facing upwards
to match the correct side (hand) of the knee based on
preoperative planning and assessment of valgus angle.
3.
Slide the IM T-Handle rod through the valgus bushing
and in to the femoral canal until the assembled valgus
alignment guide touches at least one of the distal
femoral condyles (Figure 2).
4.
Connect the universal cutting block to the valgus
alignment guide with the “F” mark facing upwards and
allow the cutting block to sit in a neutral position within
the trochlea.
5.
Use trocar pins to secure the distal femoral cutting
block to the anterior femur through the two holes
marked “0” (Figure 3).
Femoral preparation
Figure 1
Figure 2
Figure 3
Содержание Syncera Anthem
Страница 1: ...Surgical Technique...