-46-
NO.ZK2-OM00501-B
Maintenance
How to reset the product for power cut or forcible de-energizing
The setting of the product will be retained as it was before a power cut or de-energizing.
The output condition is also basically recovered to that before a power cut or de-energizing, but may change
depending on the operating environment. Therefore, check the safety of the whole facility before operating the
product.
If the facility is under accurate control, wait until it has warmed up. (Approximately 10 to 15 minutes)
Содержание ZK2-ZSV-A Series
Страница 22: ...21 NO ZK2 OM00501 B Reversed output out1 A...