HRX-OM- T002
Chapter 3 Transport and Setting Up
3.3
Installation
HRS090 Series
3-14
3.3.3
Preparation and wiring of power supply cable
Be sure to lock out and tag out the breaker of the facility power supply
(customer power supply facility) before wiring.
The electrical facilities should be installed and wired in accordance
with local laws and regulations of each country and by a person
who has knowledge and experience.
Check the power supply. Operation with voltages, capacities and
frequencies other than the specified values can cause fire and
electrical shock.
Wire with an applicable cable size and terminal. Forcibly mounting
with an unsuitable size cable may result in heat generation or fire.
Be sure to connect the power supply cable from the product side first,
and then connect the breaker of the facility power supply (the user’s
machine power supply).
When the panel is removed or mounted, be sure to wear protective
shoes and gloves to prevent injury with the edge of the panel.
Содержание HRS090-A...-20 Series
Страница 8: ...HRX OM T002 Contents HRS090 Series...
Страница 20: ...HRX OM T002 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS090 Series 2 6...
Страница 64: ...HRX OM T002 Chapter 4 Starting the Product 4 6 Adjustment of Circulating Fluid flow rate HRS090 Series 4 10...
Страница 188: ...HRX OM T002 Chapter 9 Documents 9 9 Daily Check Sheet HRS090 Series 9 16...
Страница 191: ......