3-1
C
HAPTER
3
I
NSTALLING
THE
S
WITCH
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment rack or on a
flat surface. Be sure to follow the guidelines below when choosing a
location.
•
The site should:
- be at the center of all the devices you want to link and near a power
outlet.
- be able to maintain its temperature within 0 to 50 °C (32 to 122 °F),
and its humidity within 5% to 95%, non-condensing
- provide adequate space (approximately two inches) on all sides for
proper air flow
- be accessible for installing, cabling, and maintaining the devices
- allow the status LED indicators to be clearly visible
•
Make sure that twisted-pair cable is always routed away from power
lines, fluorescent lighting fixtures and other sources of electrical
interference, such as radios and transmitters.
•
Make sure that the unit is connected to a separate grounded power
outlet that:
- provides 100 to 240 VAC, 50 to 60 Hz
- is within 2 m (6.6 feet) of each device
- is powered from an independent circuit breaker
Содержание 6826MPE
Страница 2: ......
Страница 20: ...FIGURES xiv ...
Страница 40: ...NETWORK PLANNING 2 8 ...
Страница 54: ...INSTALLING THE SWITCH 3 14 Stop bit One Data bits 8 Flow control none ...
Страница 76: ...CABLES B 8 ...
Страница 82: ...ORDERING INFORMATION D 2 ...
Страница 88: ...GLOSSARY Glossary 6 ...
Страница 92: ...INDEX Index 4 ...
Страница 93: ......