![SMC Networks 6826MPE Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/smc-networks/6826mpe/6826mpe_installation-manual_1300180064.webp)
M
AKING
N
ETWORK
C
ONNECTIONS
4-10
To best manage the physical implementations of your network, follow
these guidelines:
•
Clearly label the opposing ends of each cable.
•
Using your building’s floor plans, draw a map of the location of all
network-connected equipment. For each piece of equipment, identify
the devices to which it is connected.
•
Note the length of each cable and the maximum cable length
supported by the switch ports.
•
For ease of understanding, use a location-based key when assigning
prefixes to your cable labeling.
•
Use sequential numbers for cables that originate from the same
equipment.
•
Differentiate between racks by naming accordingly.
•
Label each separate piece of equipment.
•
Display a copy of your equipment map, including keys to all
abbreviations at each equipment rack.
Содержание 6826MPE
Страница 2: ......
Страница 20: ...FIGURES xiv ...
Страница 40: ...NETWORK PLANNING 2 8 ...
Страница 54: ...INSTALLING THE SWITCH 3 14 Stop bit One Data bits 8 Flow control none ...
Страница 76: ...CABLES B 8 ...
Страница 82: ...ORDERING INFORMATION D 2 ...
Страница 88: ...GLOSSARY Glossary 6 ...
Страница 92: ...INDEX Index 4 ...
Страница 93: ......