![SMC Networks 6826MPE Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/smc-networks/6826mpe/6826mpe_installation-manual_1300180043.webp)
E
QUIPMENT
C
HECKLIST
3-3
Equipment Checklist
After unpacking this switch, check the contents to be that sure you have
received all the components. Then, before beginning the installation, be
sure that you have all other necessary installation equipment.
Package Contents
•
24-Port Fast Ethernet PoE Switch
•
AC power cord
•
Owner registration card
•
Serial cable
•
Rack mounting kit
•
This Installation Guide
•
Installation and Management Guide CD
Note:
An optional stacking connector and cable is also available.
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following
equipment available:
•
Four mounting screws for each device you plan to install in a
rack—these are not included
•
A screwdriver (Phillips or flathead, depending on the type of screws
used)
Содержание 6826MPE
Страница 2: ......
Страница 20: ...FIGURES xiv ...
Страница 40: ...NETWORK PLANNING 2 8 ...
Страница 54: ...INSTALLING THE SWITCH 3 14 Stop bit One Data bits 8 Flow control none ...
Страница 76: ...CABLES B 8 ...
Страница 82: ...ORDERING INFORMATION D 2 ...
Страница 88: ...GLOSSARY Glossary 6 ...
Страница 92: ...INDEX Index 4 ...
Страница 93: ......