background image

 

 

ROOF  ASSEMBLY CONT...

 

13

 

FRONT WALL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIDE

 

WALL

 

BACK WALL

 

TOP PLATE

 

BOTTOM PLATE

 

 

 

 

SIDE

 

WALL

 

 

 

 

RIDGE BEAM

 

 

 

 

 

STEP 5:

 

 

• 

Place barge flashings on roof at end of 
shed ensuring the diagonal trimmed end is 
facing out. (See diagram on pg 5)

 

 

• 

Rivet the Barge Flashings to the roof and 
the side wall, using four rivets on top of 
barge and four into the side (

fig.3

).

 

STEP 3:

 

 

 

• 

Ensure shed is sitting level and square.

 

 

• 

Beginning  from  the  left  hand  end  (looking  from  front) 

centralise the Roof sheets on the Ridge Beam. 

 

 

• 

Ensure that the Roof is tight against the Gable Wall Sheets. Screw 1 x 50mm Roofing screw through the 1st pan into the 

Ridge Beam. 

(a 

-

 fig.2).

 

 

• 

At the back left hand corner, (from front) line up the ribs on the Roof Sheet with the ribs on the Wall Sheet then using 1 x 

50mm Clout, predrill and nail Roof Sheet through the rib into the Top Plate. 

(b–

 

fig.2.)

Repeat at the front

 

left hand cor-

ner. 

(c 

-

 fig.2).

 

STEP 6:

 

 

• 

Rivet the Ridge Cap to the centre of the 
roof using 8 x rivets as shown (

fig.2

).

 

 

= Clout

 

= Screw

 

fig.1

 

Pan

 

Rib

 

fig.2

 

IMPORTANT

 

Use 50mm Clouts only on ribs covered by flashings, shown in 
fig.2. Predrill holes using a 3.5mm drill bit. 

 

Use Roofing Screws on all other ribs and pans. 

Ensure 

screws are not overtightened as this can damage the seals 
and cause the shed to leak.

 

STEP 4:

 

 

• 

Centralise the Roof at the other end (R/H end) with the Ridge Beam. 

 

 

• 

Using 1 x 50mm Roofing Screw, fix roof sheet though the pan, to the other end of 

Ridge Beam. 

(d–fig.2).    

 

     

 

• 

Using 2 x 50mm Clouts fix sheet  though rib to front & back Top Plates.  (

e–fig.2).  

 

 

• 

Ensure that the Ridge Beam is straight, screw roof sheets to ridge beam  beside 

each overlap, through the pan using 4 x 50mm Roofing screws. 

 

 

• 

Ensure the Front and Back Top Plates are straight. Screw the roof sheets to the 
front & back Top Plates, through the ribs, using 1 x Roofing Screw per rib. (

fig.1

).

 

fig.3

 

X 4

 

X 4

 

Barge

 

Spouting

 

fig.4

 

STEP 7:

 

 

• 

Place spouting in position and rivet to Barge 
Flashings at each end and rivet to roof sheets 
(1 rivet per 1 sheet) 

(fig.4).

 

a

 

b

 

c

 

d

 

e

 

e

 

Содержание SM2520

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2520 BASE SIZE 2 520m x 2 020m...

Страница 2: ......

Страница 3: ...eyes and ears For ease of assembly use a friend to help TOOLS REQUIRED WARRANTY REQUIREMENTS The following maintenance process needs to be adhered to to qualify for the steel warranty of your Duratuf...

Страница 4: ...2 200m 5 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 1 550m 2 Door Top Bottom 0 945m 2 Jack Studs 45 x 30 0 200m 2 Hardware Pack 1 To...

Страница 5: ...TY DIAGRAM Front Back Bottom Plates H4 Green 2 520 m 2 Front Back Top Plate H1 Red 2 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 45 2 520m...

Страница 6: ...AY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Side Back Wall...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will protrude be low...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ts on timber Ensure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two c...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...nd use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central p...

Страница 14: ...Rivet the Ridge Cap to the centre of the roof using 8 x rivets as shown fig 2 Clout Screw fig 1 Pan Rib fig 2 IMPORTANT Use 50mm Clouts only on ribs covered by flashings shown in fig 2 Predrill holes...

Страница 15: ...LOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal Bo...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...