ASSEMBLE FRONT PANEL

 

10

 

BOTTOM PLATE

 

1854mm

 

1854mm

 

TOP PLATE

 

SELECT:

 

 

3 x 1.890 Wall Sheets

 

1 x 2.520 Top Plate (Red)

 

1 x 2.520 Bottom Plate (Green)

 

2 x 1.890 Door Jamb Flashings

 

40 x 30mm Galv Clouts

 

19 x Rivets

 

STEP 1:

 

 

• 

Lay out 1 x Top Plate and 1 x Bottom Plate on a flat 
surface as shown 

 

STEP 2:

 

 

• 

Using 2 x 30mm clouts, nail the Door Jamb Flashing flush with 
the top of the Top Plate at the correct  measurement as shown 
in plan view. Pre drill holes using a 3.5mm drill bit

 

 

• 

Check the distance between the top and bottom plates then use 
a further 2 x 30mm clouts to nail the Door Jamb Flashings to 
the bottom Plate. Pre drill holes.

 

STEP 4:

 

 

• 

Place the door on the panel (In open position, approx 
20mm below top of top plate). Using two rivets, rivet the top 
and bottom hinges to the Door Jamb Flashing, ensuring 
door closes properly. 

 

 

• 

Fit remaining rivets.

 

STEP 3:

 

 

• 

Place 3 x Wall Sheets on timber.

 

 

• 

Ensure that the top of the sheets are flush with the top of the 
Top Plate and that the sides of the wall sheets overhang the 
Top Plate by 

15mm

 as shown. Nail wall sheets to Top Plate 

(two clouts per pan)

 

 

• 

Nail the wall sheets to the Bottom Plate making sure that the 
Plates are the correct distance apart and that the sides of the 
wall sheets overhang the Bottom Plate by 

15mm

.

 

 

• 

Drill & rivet Door Jamb Flashings to wall sheets using four 
rivets equally spaced on each side.

 

NOTE: 

The

 

Doorway is standard at 530mm from left

-

hand end. 

To shift the doorway to the right

-

hand side of the front 

wall, simply measure 530mm from the right

-

hand end.

 

NOTE: 

Door can be hinged on either side.

 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING;

 

 

For sheds with Raised Base Plate option only (see page 6), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

.

 

TOP PLATE

 

TOP PLATE

 

15mm

 

15mm

 

15mm

 

15mm

 

530mm

 

960mm

 

TOP PLATE

 

DOOR OPENING

 

x3

 

x3

 

x3

 

Plan View

 

TOP

 

PLATE

 

DOOR

 

JAMB

 

NAIL

 

Содержание SM2520

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2520 BASE SIZE 2 520m x 2 020m...

Страница 2: ......

Страница 3: ...eyes and ears For ease of assembly use a friend to help TOOLS REQUIRED WARRANTY REQUIREMENTS The following maintenance process needs to be adhered to to qualify for the steel warranty of your Duratuf...

Страница 4: ...2 200m 5 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 1 550m 2 Door Top Bottom 0 945m 2 Jack Studs 45 x 30 0 200m 2 Hardware Pack 1 To...

Страница 5: ...TY DIAGRAM Front Back Bottom Plates H4 Green 2 520 m 2 Front Back Top Plate H1 Red 2 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 45 2 520m...

Страница 6: ...AY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Side Back Wall...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will protrude be low...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ts on timber Ensure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two c...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...nd use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central p...

Страница 14: ...Rivet the Ridge Cap to the centre of the roof using 8 x rivets as shown fig 2 Clout Screw fig 1 Pan Rib fig 2 IMPORTANT Use 50mm Clouts only on ribs covered by flashings shown in fig 2 Predrill holes...

Страница 15: ...LOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal Bo...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...