ROOF  ASSEMBLY

 

SELECT:

 

 

5 x 2.200 m Roof Sheets

 

2 x 2.555 m Spouting

 

4 x 1.102 m Barges

 

2 x 1.555 m  Ridge Flashing

 

1 x 2.520 m Ridge Beam

 

2 x 0.200 m Jack Studs

 

8 x 75mm Screws

 

27 x 50mm Roofing Screws

 

62 x Rivets

 

4 x 50mm Clouts

 

 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 

ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides. 

 

The Clear Roof Panel must be secured to the Top Plate and the 
Ridge Beam. Pre drill and fasten with the 50mm roofing screws 
provided.

.

 

STEP 1:

 

 

• 

Place the Ridge Beam on a level surface and use 2 x 75mm 
screws to secure the Jack Studs to the underside of the Ridge 
Beam, one at each end (

fig. 1

).

 

 

• 

Turn the Ridge Beam /Jack Stud assembly over and place it on 
the timber Top Plate in a central position. 

 

 

• 

Secure with 2 x  75mm screws through the top of the Jack Studs 
into the Timber Top Plate (

fig. 2

).

 

STEP 2:

 

 

• 

Position the first roof sheet with the centre slots over the 
middle of the Ridge Beam. Gently fold the roof sheet over 
the Ridge Beam so that the ends touch the front & back Top 
Plates. 

 

 

• 

Repeat with second roof sheet.

 

 

• 

Rivet sheets together at overlaps ,one  rivet either side of the 
ridge beam (

fig. 3

). 

 

 

• 

Repeat with remaining roof sheets

 

12

 

JACK STUD

 

TOP PLATE

 

RIDGE BEAM

 

fig. 1

 

fig. 2

 

fig. 3

 

SIDE

 

WALL

 

FRONT 

WALL

 

BACK 

WALL

 

SIDE

 

WALL

 

TOP PLATE

 

BOTTOM PLATE

 

RIDGE BEAM

 

Содержание SM2520

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2520 BASE SIZE 2 520m x 2 020m...

Страница 2: ......

Страница 3: ...eyes and ears For ease of assembly use a friend to help TOOLS REQUIRED WARRANTY REQUIREMENTS The following maintenance process needs to be adhered to to qualify for the steel warranty of your Duratuf...

Страница 4: ...2 200m 5 Door Sheet Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 102m 4 Ridge Cap 1 550m 2 Door Top Bottom 0 945m 2 Jack Studs 45 x 30 0 200m 2 Hardware Pack 1 To...

Страница 5: ...TY DIAGRAM Front Back Bottom Plates H4 Green 2 520 m 2 Front Back Top Plate H1 Red 2 520 m 2 Side Wall Bottom Plates H4 Green 2 020 m 2 Side Wall Top Plates H1 Red 2 020 m 2 Ridge Beam 90 x 45 2 520m...

Страница 6: ...AY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Side Back Wall...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the b...

Страница 9: ...overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will protrude be low...

Страница 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...ts on timber Ensure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two c...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...nd use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central p...

Страница 14: ...Rivet the Ridge Cap to the centre of the roof using 8 x rivets as shown fig 2 Clout Screw fig 1 Pan Rib fig 2 IMPORTANT Use 50mm Clouts only on ribs covered by flashings shown in fig 2 Predrill holes...

Страница 15: ...LOOR KIT OPTIONAL Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square Check that the diagonal Bo...

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: