SMA
Technologie AG
Installation
Installation Guide
SB1700-11:SE2006
Page 25
5.
Now screw the pressure screw into into
the threaded sleeve and tighten it.
6.
Firmly tighten the screw fitting against
the seal and in order to fasten the cable.
The AC connecting socket is now fully assembled.
If you are not going to connect up the Sunny Boy immediately, close off the socket
element using the cap included in the delivery of your Sunny Boy.
If the Sunny Boy is already mounted, you can now connect up the assembled AC
connection socket to the AC-plug on the Sunny Boy. To do this, remove the protective
cap from the plug on the Sunny Boy. Firmly tighten the threaded ring on the AC
connecting socket to the plug to seal the connection and secure it.
Do not switch the line circuit breaker on yet! The Sunny Boy 1700
may only be connected to the AC grid once the PV strings are
connected and the device is securely closed.
Pressure screw
PG16 screw fitting
Содержание SUNNY BOY 1700
Страница 2: ......
Страница 6: ...SMA Technologie AG Page 6 SB1700 11 SE2006 Installation Guide...
Страница 8: ...Foreword SMA Technologie AG Page 8 SB1700 11 SE2006 Installation Guide...
Страница 10: ...Safety information SMA Technologie AG Page 10 SB1700 11 SE2006 Installation Guide...
Страница 30: ...Opening and closing the Sunny Boy SMA Technologie AG Page 30 SB1700 11 SE2006 Installation Guide...
Страница 38: ...Replacing the varistors SMA Technologie AG Page 38 SB1700 11 SE2006 Installation Guide...
Страница 42: ...Rating for a line circuit breaker SMA Technologie AG Page 42 SB1700 11 SE2006 Installation Guide...
Страница 44: ...Contact SMA Technologie AG Page 44 SB1700 11 SE2006 Installation Guide...
Страница 45: ......
Страница 46: ......
Страница 47: ......