Installation
SMA
Technologie AG
Page 22
SB1700-11:SE2006
Installation Guide
Connecting the AC output with PG13.5
To connect a cable with a maximum diameter of 13.5 mm, proceed as follows.
1.
Press the sealing ring into the cord grip.
2.
Now slide the pressure screw over the cable first of all, followed by the cord
grip with the sealing ring in it. Now slide the threaded sleeve over the cable.
3.
Now connect the individual conductors to the socket element.
-
Protective earth PE (green/yellow) to the screw terminal
with the earth sign. It is required that the PE wire is
slightly longer than the L and N wires.
-
Neutral conductor N (blue) to screw terminal 1.
-
Live L (brown or black) to screw terminal 2.
-
Terminal 3 remains unused.
4.
Make sure the wires are securely connected.
Sealing ring
Cord grip
Cord grip with
sealing ring
Pressure screw
Threaded sleeve
1
2
3
Terminals in the socket
element
Cord grip with
sealing ring
Pressure screw
Threaded sleeve
Socket element
Connected wires
Содержание SUNNY BOY 1700
Страница 2: ......
Страница 6: ...SMA Technologie AG Page 6 SB1700 11 SE2006 Installation Guide...
Страница 8: ...Foreword SMA Technologie AG Page 8 SB1700 11 SE2006 Installation Guide...
Страница 10: ...Safety information SMA Technologie AG Page 10 SB1700 11 SE2006 Installation Guide...
Страница 30: ...Opening and closing the Sunny Boy SMA Technologie AG Page 30 SB1700 11 SE2006 Installation Guide...
Страница 38: ...Replacing the varistors SMA Technologie AG Page 38 SB1700 11 SE2006 Installation Guide...
Страница 42: ...Rating for a line circuit breaker SMA Technologie AG Page 42 SB1700 11 SE2006 Installation Guide...
Страница 44: ...Contact SMA Technologie AG Page 44 SB1700 11 SE2006 Installation Guide...
Страница 45: ......
Страница 46: ......
Страница 47: ......