Replacing the varistors

SMA

 

Technologie AG

Page 36

SB1700-11:SE2006

Installation Guide

5.

Repeat points 3 and 4 for each string. 
If you found a earth fault, it is probably not necessary to replace the varistors.
Instead, make sure the ground fault is fixed. Generally the PV generator's
installation  engineer  should  be  hired  for  this  job.  In  this  case  continue  as
described under point 10, but without reconnecting the faulty string. Protect its
DC plug against accidental touch contact (e.g. by fitting the protective caps or
using sufficient high-voltage insulating tape).

If you did not find any earth fault in the PV generators, it is likely that one of the
thermally monitored varistors has lost its protective function. These components
are wearing parts. Their functioning diminishes with age or following repeated
responses as a result of overvoltages. You can now check these varistors in the
following way, paying attention to the safety information in section 2 "Safety
information" (page 9).

6.

Remove the screws that secure the lid and remove the lid from the Sunny Boy
1700. Disconnect the PE connection from the lid. Make sure that no voltage is
present.

7.

Using a continuity tester, check all the varistors to see if there is a conducting
connection between connectors 2 and 3. If there isn't, then that varistor is not
working. The positions of the varistors in the Sunny Boy 1700 can be seen in the
diagram in section 3.1 "Unit description" (page 11).

8.

Replace the varistor concerned with a new one
as shown in the drawing to the right. Ensure the
varistor is installed the right way round! If you
do not receive a special tool for operating the
terminal clamps with your replacement
varistors, please contact SMA. As an
alternative, the terminal contacts can be
operated using a suitable screwdriver. Since the
failure of one varistor is generally due to factors
that affect all varistors in a similar way
(temperature, age, inductive overvoltages), it is
highly recommended that you replace both
varistors, not just the one that is obviously
defective. The varistors were specially
manufactured for use in the Sunny Boy 1700
and are not commercially available. They must
be ordered directly from 

SMA

 Technologie AG

(SMA order code: SB-TV4).

Insert the special tool to open

the terminal clamp.

The pole with the small loop

(crimp) must be fitted to

terminal 1 when replacing the

varistor.

Remove the varistor.

3 21

Содержание SUNNY BOY 1700

Страница 1: ...Sunny Boy 1700 String Inverter Sunny Boy 1700 Installation Guide Version 1 1 SB1700 11 SE2006 IME SB1700...

Страница 2: ......

Страница 3: ...or a trouble free and safe operation of the product Please read these sections care fully in order to avoid any damages of the equipment and for op timal personal protection This symbol indicates info...

Страница 4: ...protection Arbitrary changing of the product or the provided software Failure of the product due to interference of connected or contiguous devices out of legal limit values Disasters and force majeur...

Страница 5: ...ator requirements 15 4 3 Low Voltage Grid 230 V AC Requirements 15 5 Installation 19 5 1 Mounting the Sunny Boy 19 5 2 Electrical installation 20 5 3 Startup 27 6 Opening and closing the Sunny Boy 29...

Страница 6: ...SMA Technologie AG Page 6 SB1700 11 SE2006 Installation Guide...

Страница 7: ...Backs which has been delivered with the device If you require further information please call the Sunny Boy hotline on the following number 49 561 95 22 499 The installation of the Sunny Boy may only...

Страница 8: ...Foreword SMA Technologie AG Page 8 SB1700 11 SE2006 Installation Guide...

Страница 9: ...e lid removed the AC and DC voltages MUST be disconnected from the Sunny Boy and it must be sure that all capacitors are discharged The Sunny Boy must be disconnected from the mains and precautions mu...

Страница 10: ...Safety information SMA Technologie AG Page 10 SB1700 11 SE2006 Installation Guide...

Страница 11: ...view of the various components and connection points inside the Sunny Boy 1700 with the lid removed PE L N Varistors page 35 Socket for communication RS232 RS485 NLM Piggy Back Radio PE protective ear...

Страница 12: ...Overview SMA Technologie AG Page 12 SB1700 11 SE2006 Installation Guide 3 2 Dimensions of the Sunny Boy 1700 214 mm 295 mm 434 mm...

Страница 13: ...increased ambient temperature can reduce the yield of the PV system The Sunny Boy is designed to be mounted on a vertical wall For an optimum energy yield and the most convenient operation vertical i...

Страница 14: ...nit to a solid wall The Sunny Boy 1700 will emit a slight noise during operation This noise can be annoying when the Sunny Boy is installed within a living area Unintentionally pulling out the DC plug...

Страница 15: ...ring is available as an optional accessory The SMA order codes for the various connectors are as follows Multi contact 3 mm SWR MC Multi contact 4 mm MC SET Tyco TYCO SET 4 3 Low Voltage Grid 230 V AC...

Страница 16: ...ker Adequate clearance between the circuit breakers in order to avoid excessive heating automatic circuit breakers trip earlier when they are warmer Selectivity Protection class of the connected load...

Страница 17: ...ine losses do not exceed 1 at the nominal power Line losses depending on the cable length and cross section are shown in the graph below It is based on a multi conduit cable with all conduits made of...

Страница 18: ...ith an automatic 50 Hz 60 Hz utility frequency detection It can therefore be connected to a 50 Hz or 60 Hz utility without any further configuration changes Pay attention to the local utility regulati...

Страница 19: ...ials be sure to take the weight of the Sunny Boy 1700 into account 25 kg 1 Fit the wall bracket 1 To mark the positions to drill the holes you can use the wall bracket as a drilling template 2 Now hoo...

Страница 20: ...2006 Installation Guide 5 2 Electrical installation The complete wiring for a Sunny Boy 1700 is shown schematically in the following diagram Check the correct polarity before you connect the PV string...

Страница 21: ...es Before you connect the mains cable to the AC connection socket make sure that no voltage is present at the cable 1 Check the grid voltage If this is higher than 260 V the Sunny Boy 1700 will not be...

Страница 22: ...able 3 Now connect the individual conductors to the socket element Protective earth PE green yellow to the screw terminal with the earth sign It is required that the PE wire is slightly longer than th...

Страница 23: ...cket element using the cap included in the delivery of your Sunny Boy If the Sunny Boy is already mounted you can now connect up the assembled AC connection socket to the AC plug on the Sunny Boy To d...

Страница 24: ...ow to the screw terminal with the earth sign It is required that the PE wire is slightly longer than the L and N wires Neutral conductor N blue to screw terminal 1 Live L brown or black to screw termi...

Страница 25: ...ment using the cap included in the delivery of your Sunny Boy If the Sunny Boy is already mounted you can now connect up the assembled AC connection socket to the AC plug on the Sunny Boy To do this r...

Страница 26: ...he direct current voltage between one DC plug connector of a string and earth potential 3 If the measured voltages are constant and if their total is roughly the same as the open circuit voltage of th...

Страница 27: ...ted in section 4 2 PV generator requirements page 15 If the Sunny Boy still indicates a too high DC voltage even though the voltage is within the specification contact SMA Technologie AG see section 1...

Страница 28: ...een Red Yellow Status on off off OK feeding grid on off failure on OK initialisation blinking quickly 3 x per second off off OK stop on off failure on blinking 1 x per second off off OK waiting grid m...

Страница 29: ...remove it from the lid and take the lid off 6 2 Closing the Sunny Boy 1 Reconnect the earth wire PE to the lid Now secure the lid to the Sunny Boy 1700 by tightening the four screws 2 Connect the PV...

Страница 30: ...Opening and closing the Sunny Boy SMA Technologie AG Page 30 SB1700 11 SE2006 Installation Guide...

Страница 31: ...iso 1 M Operating consumption 5 W standby Reverse polarity protection Short circuit diode Nominal output power PACnom 1550 W Peak output power PACmax 1700 W Nominal output current IACnom 6 7 A Harmoni...

Страница 32: ...e input voltage the higher is the efficiency of the Sunny Boy 1700 Protection category per DIN EN 60529 IP65 Dimensions w x h x d 434 mm x 295 mm x 214 mm approx Weight 25 kg approx Data transmission...

Страница 33: ...y without express authorization and instructions Name Unit Value range Factory setting Betriebsart Operating mode MPP IKonst UKonst Stopp Turbine Mode Insel Mode MPP Default GER ENS dFac Max Hz s 0 00...

Страница 34: ...parameter list but cannot be changed Name Unit Value range Factory setting Description Plimit W 1700 Upper limit for AC output power SMA SN Serial number of the Sunny Boy Software BFR Firmware BFR Fi...

Страница 35: ...this string Its approximate location can be deduced from the relationships between the voltages 1 Disconnect the Sunny Boy 1700 from the low voltage grid switch the line circuit breaker to its off po...

Страница 36: ...tion from the lid Make sure that no voltage is present 7 Using a continuity tester check all the varistors to see if there is a conducting connection between connectors 2 and 3 If there isn t then tha...

Страница 37: ...this case Replacement varistors should be obtained as soon as possible In systems with a high risk of overvoltages the Sunny Boy 1700 should not be operated with defective varistors 9 Reconnect the PE...

Страница 38: ...Replacing the varistors SMA Technologie AG Page 38 SB1700 11 SE2006 Installation Guide...

Страница 39: ...y of the line circuit breaker still needs to be checked Example for the thermal rating for a line circuit breaker in a photovoltaic electrical power unit operated in parallel with the low voltage grid...

Страница 40: ...load 1h 0 9 1 Reduction when 9 circuit breakers are arranged side by side without gaps 0 77 2 Increase in nominal current as a result of ambient temperatures of 40 C in the circuit breaker panel 1 07...

Страница 41: ...would mean that the reduction factor is 0 98 instead of 0 77 As a result the maximum current carrying capacity would increase to 9 44 A As well as the thermal rating of the circuit breakers and all ot...

Страница 42: ...Rating for a line circuit breaker SMA Technologie AG Page 42 SB1700 11 SE2006 Installation Guide...

Страница 43: ...1700 please contact our hotline Please have the following information available when you contact SMA Inverter type Type and number of connected modules Communication method Serial number of the Sunny...

Страница 44: ...Contact SMA Technologie AG Page 44 SB1700 11 SE2006 Installation Guide...

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ...ity Square No Jia 3 Shilipu Road Changyang District 100025 Beijing PR China Tel 86 10 65 58 78 15 www SMA CHINA com SMA America Inc 12438 Loma Rica Drive Unit C Grass Valley CA 95945 USA Tel 1 530 273...

Отзывы: