![SMA CLCON-10 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/sma/clcon-10/clcon-10_installation-manual_1294241043.webp)
Procedure:
1. Connect the connection cable to the module temperature sensor (see the manual from
manufacturer). Trim the unneeded insulated conductors up to the cable shield and note down
the conductor colors.
2. For connection to the Cluster Controller using two-conductor connection technology, perform
the following steps:
• On the five-pole plug, unlock conductor entry 1 using a screwdriver and insert the
insulated conductor of the wire into the conductor entry.
• On the five-pole plug, unlock conductor entries 3 and 4 using a screwdriver and insert the
insulated conductors of the connection cable into the conductor entries. Observe the pin
assignment.
• At terminal
X7
in pin row
B
, place a bridge between pin 2 and pin 3 and between pin 4
and pin 5.
3. For connection to the Cluster Controller using four-conductor connection technology, perform
the following steps:
• On the five-pole plug, unlock conductor entry 1 using a screwdriver and insert the
insulated conductor of the wire into the conductor entry.
• On the five-pole plug, unlock conductor entries 2, 3, 4 and 5 using a screwdriver and
insert the insulated conductors of the connection cable into the conductor entries.
Observe the pin assignment.
4. Insert the five-pole plug into pin row
B
in terminal
X7
.
5. On the connection cable, mark the terminal and the pin row to which the connection cable is
assigned. Use the supplied cable tie with caption field.
6. Write down the terminal assignment on the supplied supplementary sheet.
6.11.2 Connecting an Irradiation Sensor
You can connect one irradiation sensor or pyranometer to the Cluster Controller. The measured
value from the irradiation sensor or pyranometer is shown on the display and the user interface of
the Cluster Controller and transmitted to Sunny Portal. In Sunny Portal, the measured values are
used to calculate the performance ratio.
Additionally required material (not included in the scope of delivery):
☐ 1 irradiation sensor
☐ 1 connection cable (see Section 6.3 "Cable Requirements", page 28)
Requirements:
☐ The sensor must be technically suitable for connection to the analog inputs (see Section 9,
☐ The connection cable must be prepared for connection to the multipole plug (see Section 6.5,
6 Connection and Commissioning
SMA Solar Technology AG
Installation Manual
43
ClusterController-IA-en-15
Содержание CLCON-10
Страница 1: ...Installation Manual SMA CLUSTER CONTROLLER ClusterController IA en 15 Version 1 5 ENGLISH ...
Страница 85: ......