![SMA CLCON-10 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/sma/clcon-10/clcon-10_installation-manual_1294241042.webp)
3. For connection to the Cluster Controller using four-conductor connection technology, perform
the following steps:
• On the five-pole plug, unlock conductor entry 1 using a screwdriver and insert the
insulated conductor of the wire into the conductor entry.
• On the five-pole plug, unlock conductor entries 2, 3, 4 and 5 using a screwdriver and
insert the insulated conductors of the connection cable into the conductor entries.
Observe the pin assignment.
4. Insert the five-pole plug into pin row
A
in terminal
X7
.
5. On the connection cable, mark the terminal and the pin row to which the connection cable is
assigned. Use the supplied cable tie with caption field.
6. Write down the terminal assignment on the supplied supplementary sheet.
Connecting the Module Temperature Sensor
Additionally required accessories (not included in scope of delivery):
☐ 1 module temperature sensor
☐ 1 connection cable (see Section 6.3, page 28)
Requirements:
☐ The sensor must be technically suitable for connection to the temperature inputs (see Section 9,
☐ The connection cable must be prepared for connection to the multipole plug (see Section 6.5,
Figure 14: Pin assignment for pin group
Temperature input 2
Pin
Signal
Explanation
B1
GND
Shield ground
B2
I+
Current input
B3
V+
Voltage input
B4
V−
Voltage return
B5
I−
Current return
6 Connection and Commissioning
SMA Solar Technology AG
Installation Manual
ClusterController-IA-en-15
42
Содержание CLCON-10
Страница 1: ...Installation Manual SMA CLUSTER CONTROLLER ClusterController IA en 15 Version 1 5 ENGLISH ...
Страница 85: ......
Страница 86: ...SMA Solar Technology www SMA Solar com ...