2. Determine the rotary switch setting for the desired display language. Call up the Technical
Information "Overview of the Rotary Switch Settings" at www.SMA-Solar.com.
3. Set the rotary switch
A
to
0
using a flat-blade
screwdriver (blade width: 2.5 mm). This ensures
that the selected data country set remains
unchanged.
4. Set the rotary switch
B
to the required language using a flat-blade screwdriver (blade width:
2.5 mm).
5. Recommission the inverter (see service manual at www.SMA-Solar.com).
☑ The inverter adopts the settings after commissioning. This can take up to five minutes.
8.3
Connecting the Inverter to the Network
Additionally required material (not included in the scope of delivery):
☐ One mating plug for RJ45 pin connector in accordance with IEC 61076-3-106, model 4 with
push-pull lock
SMA Solar Technology AG recommends the plug sets "STX V4 RJ45" from "Telegärtner" or
"IE-PS-V04P-RJ45-FH" from "Weidmüller".
☐ 1 network cable
Cable requirements:
The cable length and quality affect the quality of the signal. Observe the following cable
requirements.
☐ Cable type: 100BaseTx
☐ Cable category: Cat5, Cat5e, Cat6, Cat6a or Cat7
☐ Plug type: RJ45 of Cat5, Cat5e, Cat6 or Cat6a
☐ Shielding: SF/UTP, S/UTP, SF/FTP or S/FTP
☐ Number of insulated conductor pairs and insulated conductor cross-section: at least
2 x 2 x 0.22 mm²
☐ Maximum cable length between two nodes when using patch cables: 50 m
☐ Maximum cable length between two nodes with installation cable: 100 m
☐ UV-resistant for outdoor use
8 Configuration
SMA Solar Technology AG
Operating Manual
STP5-12TL-20-BE-en-15
48
Содержание 10000TL
Страница 74: ...www SMA Solar com ...