6.5

DC Connection .................................................................................. 38

6.5.1

Requirements for the DC Connection ........................................... 38

6.5.2

Connecting the PV Array............................................................... 39

7

Commissioning ......................................................................... 42

7.1

Commissioning Procedure................................................................. 42

7.2

Configuring the Country Data Set .................................................... 42

7.3

Setting the NetID ............................................................................... 43

7.4

Commissioning the Inverter ............................................................... 45

8

Configuration............................................................................ 47

8.1

Configuration Procedure ................................................................... 47

8.2

Changing the Display Language...................................................... 47

8.3

Connecting the Inverter to the Network ........................................... 48

8.4

Integrating the Inverter into the Network ......................................... 49

8.5

Changing Operating Parameters ..................................................... 49

8.6

Configuring the Modbus Function .................................................... 50

8.7

Setting the Tripping Threshold of the Residual-Current Device ....... 51

8.8

Changing the Operating Mode of the Multifunction Relay............ 51

8.9

Setting SMA OptiTrac Global Peak ................................................. 52

9

Operation ................................................................................. 53

9.1

LED Signals ........................................................................................ 53

9.2

Display Overview .............................................................................. 53

9.3

Activating and Operating the Display ............................................. 55

9.4

Calling Up Display Messages of the Start-Up Phase ...................... 56

10 Disconnecting the Inverter from Voltage Sources ................. 57

11 Technical Data .......................................................................... 59

11.1 DC/AC............................................................................................... 59

11.1.1 Sunny Tripower 5000TL / 6000TL / 7000TL............................. 59
11.1.2 Sunny Tripower 8000TL / 9000TL / 10000TL .......................... 61
11.1.3 Sunny Tripower 12000TL ............................................................. 63

11.2 General Data..................................................................................... 64
11.3 Protective Devices.............................................................................. 66

 Table of Contents

SMA Solar Technology AG

Operating Manual

STP5-12TL-20-BE-en-15

4

Содержание 10000TL

Страница 1: ...Operating Manual SUNNY TRIPOWER 5000TL 6000TL 7000TL 8000TL 9000TL 10000TL 12000TL STP5 12TL 20 BE en 15 Version 1 5 ENGLISH ...

Страница 2: ...licitly identified as such Missing designations do not mean that a product or brand is not a registered trademark Modbus is a registered trademark of Schneider Electric and is licensed by the Modbus Organization Inc QR Code is a registered trademark of DENSO WAVE INCORPORATED Phillips and Pozidriv are registered trademarks of Phillips Screw Company Torx is a registered trademark of Acument Global ...

Страница 3: ...n 26 6 1 Safety during Electrical Connection 26 6 2 Overview of the Connection Area 27 6 2 1 View from Below 27 6 2 2 Interior View 28 6 3 AC Connection 29 6 3 1 Requirements for the AC Connection 29 6 3 2 Connecting the Inverter to the Utility Grid 30 6 3 3 Connecting Additional Grounding 31 6 4 Connecting the Multifunction Relay 32 6 4 1 Procedure for connecting the multifunction relay 32 6 4 2 ...

Страница 4: ...bus Function 50 8 7 Setting the Tripping Threshold of the Residual Current Device 51 8 8 Changing the Operating Mode of the Multifunction Relay 51 8 9 Setting SMA OptiTrac Global Peak 52 9 Operation 53 9 1 LED Signals 53 9 2 Display Overview 53 9 3 Activating and Operating the Display 55 9 4 Calling Up Display Messages of the Start Up Phase 56 10 Disconnecting the Inverter from Voltage Sources 57 ...

Страница 5: ... Torques 67 11 7 Multifunction Relay 67 11 8 Electronic Solar Switch 68 11 9 Data Storage Capacity 68 12 Accessories 69 13 Contact 70 14 EU Declaration of Conformity 73 Table of Contents SMA Solar Technology AG Operating Manual 5 STP5 12TL 20 BE en 15 ...

Страница 6: ...operated Training in how to deal with the dangers and risks associated with installing and using electrical devices and installations Training in the installation and commissioning of electrical devices and installations Knowledge of the applicable standards and directives Knowledge of and compliance with this document and all safety information 1 3 Additional Information Links to additional infor...

Страница 7: ...g and configuration of the SMA Modbus interface Technical Information SMA Modbus Interface List with the product specific SMA Modbus registers Technical Information SunSpec Modbus Interface Information on the commissioning and configuration of the Sun Spec Modbus interface Technical Information SunSpec Modbus Interface List with the product specific SunSpec Modbus registers Technical Information T...

Страница 8: ... Sections describing activities to be performed by qualified persons only Information that is important for a specific topic or goal but is not safety relevant Indicates a requirement for meeting a specific goal Desired result A problem that might occur 1 5 Nomenclature Complete designation Designation in this document Sunny Tripower Inverter product Electronic Solar Switch ESS 1 Information on th...

Страница 9: ... ensures that the inverter implements the commands from the grid operator for active power limitation at all times The inverter and the Demand Response Enabling Device DRED must be connected in the same network and the inverter Modbus interface must be activated and the TCP server set Use this product only in accordance with the information provided in the enclosed documentation and with the local...

Страница 10: ...nger to life due to electric shock Touching an ungrounded PV module or array frame can cause a lethal electric shock Connect and ground the PV modules array frame and electrically conductive surfaces so that there is continuous conduction Observe the applicable local regulations Risk of burns due to hot enclosure parts Some parts of the enclosure can get hot during operation During operation do no...

Страница 11: ...to the use of cleaning agents If the inverter is dirty clean the enclosure the enclosure lid the type label the display and the LEDs with a damp cloth and clear water only 2 Safety SMA Solar Technology AG Operating Manual 11 STP5 12TL 20 BE en 15 ...

Страница 12: ... delivery Position Quantity Designation A 1 Inverter B 2 Ventilation grid C 1 Wall mounting bracket D 1 Electronic Solar Switch E 1 Protective cover F 4 Negative DC connector G 4 Positive DC connector H 8 Sealing plug I 1 Cable gland M32x1 5 K 1 Counter nut L 1 Clamping bracket M 2 Conical spring washer N 2 Cylindrical screw M6 x 16 3 Scope of Delivery SMA Solar Technology AG Operating Manual STP5...

Страница 13: ... supplementary sheet with default set tings supplementary sheet with information on SMA Speedwire Webconnect installation manual of the DC connectors One spare part for the enclosure lid included 3 Scope of Delivery SMA Solar Technology AG Operating Manual 13 STP5 12TL 20 BE en 15 ...

Страница 14: ...tration in Sunny Portal Internet address of the PV System Setup Assistant Identification key PIC Registration ID RID C Type label The type label uniquely identifies the inverter You will require the information on the type label to use the product safely and when seeking customer sup port from the SMA Service Line You will find the following information on the type label Device type Model Serial n...

Страница 15: ...erview page 53 H Enclosure lid I Screws and conical spring washers of the enclosure lid Symbols on the inverter the ESS and the type label Symbol Explanation Inverter Together with the green LED this symbol indicates the operating state of the inverter Observe the documentation Together with the red LED this symbol indicates an error for trou bleshooting see the service manual at www SMA Solar com...

Страница 16: ...live components of the inverter Prior to performing any work on the inverter disconnect it from all voltage sources as described in this document see Section 10 page 57 Danger to life due to electric shock The product operates at high voltages All work on the product must be carried out by qualified persons only Risk of burns due to hot surfaces The product can get hot during operation Avoid conta...

Страница 17: ...the requirements of the applicable Australian standards 4 2 Interfaces and Functions The inverter can be equipped or retrofitted with the following interfaces and functions BLUETOOTH All inverters manufactured after a certain date include BLUETOOTH as standard equipment Via BLUETOOTH the inverter can communicate with various BLUETOOTH devices for information on supported SMA products see www SMA S...

Страница 18: ...l Module The inverter can communicate via cables with special SMA communication products via the RS485 interface information on supported SMA products at www SMA Solar com The SMA Power Control Module enables the inverter to implement grid management services and is equipped with an additional multifunction relay for information on installation and configuration see the installation manual of the ...

Страница 19: ...ered in Sunny Portal SMA OptiTrac Global Peak SMA OptiTrac Global Peak is an advancement of SMA OptiTrac and allows the operating point of the inverter to follow the optimal operating point of the PV array MPP precisely at all times In addition with the aid of SMA OptiTrac Global Peak the inverter detects several maximum power points in the available operating range such as may occur particularly ...

Страница 20: ...irect solar irradiation Direct solar irradiation can result in the premature aging of the exterior plastic parts of the inverter and direct solar irradiation can cause the inverter to overheat When becoming too hot the inverter reduces its power output to avoid overheating The mounting location should be freely and safely accessible at all times without the need for any auxiliary equipment such as...

Страница 21: ...Figure 3 Permitted and prohibited mounting positions 5 Mounting SMA Solar Technology AG Operating Manual 21 STP5 12TL 20 BE en 15 ...

Страница 22: ...ing Ø 9 4x 25 58 475 620 20 87 35 217 217 594 507 Ø 11 12 134 11 x 20 5x 25 58 134 Figure 4 Position of the anchoring points dimensions in mm in 5 Mounting SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 22 ...

Страница 23: ...pply 300 2300 340 1120 50 1540 300 340 1120 300 300 Figure 5 Recommended clearances dimensions in mm in 5 2 Mounting the Inverter Additionally required mounting material not included in the scope of delivery At least two screws that are suitable for the support surface and the weight of the inverter At least two washers that are suitable for the screws If necessary two screw anchors suitable for t...

Страница 24: ...ys set the inverter down on a level support surface or lay it on its back Procedure 1 Risk of injury due to damaged cables There may be power cables or other supply lines e g gas or water routed in the wall Ensure that no lines are laid in the wall which could be damaged when drilling holes 2 Align the wall mounting bracket horizontally on the wall and use it to mark the position of the drill hole...

Страница 25: ...ll mounting bracket on both sides using the M6x8 screws provided and an Allen key AF 5 Only tighten the screws hand tight 9 Close the recessed grips with the ventilation grids Ensure that the assignment is correct The correct assignment is marked on the inside of each ventilation grid links left for the left hand side and rechts right for the right hand side 10 Once the holes for attaching the saf...

Страница 26: ...y qualified persons only Prior to performing any work on the inverter disconnect it from all voltage sources as described in this document Damage to seals on the enclosure lids in subfreezing conditions If you open the enclosure lid when temperatures are below freezing the enclosure lid seal could be damaged This can lead to moisture entering the inverter Only open the enclosure lid if the ambient...

Страница 27: ...ors input A B Positive DC connectors input B C Pin connector for the ESS D Pin connector with filler plug for the network connection E Cable gland M25 with filler plug for the data cables F Enclosure opening for the AC cable G Negative DC connectors input A H Negative DC connectors input B 6 Electrical Connection SMA Solar Technology AG Operating Manual 27 STP5 12TL 20 BE en 15 ...

Страница 28: ...inverter Position Designation A Connecting terminal plate for the AC cable B Multifunction relay with protective cover C Slot for 485 Data Module Type B or SMA Power Control Module 6 Electrical Connection SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 28 ...

Страница 29: ...reaker as a load disconnection unit for information and design examples see the Technical Information Circuit Breaker at www SMA Solar com In PV systems with multiple inverters protect each inverter with a separate three phase circuit breaker Make sure to observe the maximum permissible fuse protection see Section 11 Technical Data page 59 This will prevent residual voltage being present at the co...

Страница 30: ... and remove the enclosure lid Ensure that the conical spring washers are retained 3 Remove the adhesive tape from the enclosure opening for the AC cable 4 Attach the M32x1 5 cable gland to the enclosure opening for the AC cable using a counter nut 5 Route the AC cable into the inverter through the cable gland If necessary slightly loosen the swivel nut of the cable gland 6 Dismantle the AC cable 7...

Страница 31: ... connect additional grounding to the inverter This prevents touch current if the grounding conductor at the terminal for the AC cable fails The required clamping bracket the screw and the conical spring washer are part of the scope of delivery of the inverter Cable requirement Grounding cable cross section 16 mm at maximum Procedure 1 Strip the grounding cable insulation 2 Lead the clamping bracke...

Страница 32: ...epending on the power production of the PV system Control via communica tion ComCtl The multifunction relay switches loads on or off according to com mands transmitted by a communication product Battery bank BatCha The multifunction relay controls the charging of the batteries depend ing on the power production of the PV system Fan control FanCtl The multifunction relay controls an external fan de...

Страница 33: ...m Battery bank BatCha Controlling loads via the multifunction relay or charging batteries de pending on the power production of the PV system Fan control FanCtl Connecting the external fan see fan documentation Switching status grid re lay GriSwCpy Reporting the switching status of the grid relay 6 Electrical Connection SMA Solar Technology AG Operating Manual 33 STP5 12TL 20 BE en 15 ...

Страница 34: ...played or signaled via a suitable display device You can connect multiple inverters to one fault indicator or operation indicator as needed Figure 8 Circuit diagram with multiple inverters for connection to an operation indicator and circuit diagram for connection to a fault indicator example 6 Electrical Connection SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 34 ...

Страница 35: ...ctor K1 to the multifunction relay The contactor K1 switches the operating current for the load on or off If you want batteries to be charged depending on the available power the contactor activates or deactivates the charging of the batteries Figure 9 Wiring diagram for connection for controlling a load or for the power dependent charging of the batteries 6 Electrical Connection SMA Solar Technol...

Страница 36: ...on as the inverter connects to the utility grid To enable this function the multifunction relays of all inverters must be connected in parallel Figure 10 Wiring diagram for signaling the switching status of the grid relay example 6 Electrical Connection SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 36 ...

Страница 37: ...tifunction relay as a result of excessive contact load Observe the maximum switching voltage and maximum switching current see Section 11 Technical Data page 59 When connecting the multifunction relay to the utility grid fuse the multifunction relay with a separate circuit breaker Operating the multifunction relay and 485 Data Module Type B or SMA Power Control Module in parallel If you want to op...

Страница 38: ...ing on the operating mode connect the cable to the connecting terminal plate for the connection to the multifunction relay in accordance with the circuit diagram see Section 6 4 3 page 32 7 Danger to life due to live cables If during inverter operation an insulated conductor L1 L2 or L3 becomes detached from the AC terminal there is a risk of the multifunction relay cables being live Touching the ...

Страница 39: ...inverter The adapters must not be visible or freely accessible In order to interrupt the DC circuit always disconnect the inverter as described in this document see Section 10 page 57 6 5 2 Connecting the PV Array Destruction of the inverter due to overvoltage If the open circuit voltage of the PV modules exceeds the maximum input voltage of the inverter the inverter can be destroyed due to overvo...

Страница 40: ...of the wrong polarity the DC connector must be assembled again The DC cable must always have the same polarity as the DC connector 6 Ensure that the open circuit voltage of the PV array does not exceed the maximum input voltage 7 Connect the assembled DC connectors to the inverter The DC connectors snap into place 6 Electrical Connection SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en ...

Страница 41: ...used DC connectors push down the clamping bracket and push the swivel nut up to the thread Insert the sealing plug into the DC connector Tighten the DC connector torque 2 Nm Insert the DC connectors with sealing plugs into the corresponding DC inputs on the inverter The DC connectors snap into place 9 Ensure that all DC connectors are securely in place 6 Electrical Connection SMA Solar Technology ...

Страница 42: ... set the NetID Section 7 3 page 43 4 Commission the inverter Section 7 4 page 45 7 2 Configuring the Country Data Set Set the country data set appropriate for your country or purpose within the first ten feed in hours via the rotary switches in the inverter After the first ten feed in hours the country data set can only be changed by means of a communication product A display language is assigned ...

Страница 43: ... the NetID set to 1 You must change the NetID in the following cases If your PV system consists of one inverter and two other BLUETOOTH devices e g computer with BLUETOOTH interface and SMA communication product or of multiple inverters with BLUETOOTH you must change the NetID of your PV system This enables you to communicate using multiple BLUETOOTH devices If another PV system with BLUETOOTH is ...

Страница 44: ...a BLUETOOTH with a further BLUETOOTH device 2 to F NetID for communication via BLUETOOTH with multiple BLUETOOTH devices Procedure 1 Danger to life due to high voltages Ensure that the inverter is disconnected from all voltage sources see Section 10 page 57 2 To set a new NetID set the rotary switch C to the determined NetID using a flat blade screwdriver blade width 2 5 mm 7 Commissioning SMA Sol...

Страница 45: ...DC connectors and sealing plugs The country data set must be set correctly for the country or the purpose Procedure 1 Mount the enclosure lid Fit one conical spring washer to each screw The grooved side of the conical spring washer must face the screw head Position the enclosure lid with the six screws on the enclosure and tighten all screws in the sequence 1 to 6 using an Allen key AF 5 torque 6 ...

Страница 46: ...etID the IP address the subnet mask the configured country data set and the display language The green LED is flashing Possible cause of error the DC input voltage is still too low or the inverter is monitoring the utility grid Once the DC input voltage is sufficiently high and the grid connection conditions are met the inverter will start operation The red LED is glowing and an error message and ...

Страница 47: ...time and system password Manual of the communica tion product at www SMA Solar com 6 If a residual current device with a tripping threshold of 30 mA was specified and has been installed set the trip ping threshold of the residual current device Section 8 7 page 51 7 If using the multifunction relay ensure that the operating mode is set correctly and adjust any further settings for the operating mo...

Страница 48: ...pe of delivery One mating plug for RJ45 pin connector in accordance with IEC 61076 3 106 model 4 with push pull lock SMA Solar Technology AG recommends the plug sets STX V4 RJ45 from Telegärtner or IE PS V04P RJ45 FH from Weidmüller 1 network cable Cable requirements The cable length and quality affect the quality of the signal Observe the following cable requirements Cable type 100BaseTx Cable ca...

Страница 49: ...ion There must be a router with Internet connection in the local network of the system The inverter must be connected to the router Procedure Integrate the inverter into the network by means of the SMA Connection Assist Download the SMA Connection Assist and install it on the computer see www SMA Solar com 8 5 Changing Operating Parameters This section describes the basic procedure for changing op...

Страница 50: ...ols can be changed For information on commissioning and configuration of the Modbus interface see the Technical Information SMA Modbus Interface or in the Technical Information SunSpec Modbus Interface at www SMA Solar com Data security during activated Modbus interface If you activate the Modbus interface there is a risk that unauthorized users may access and manipulate the data or devices in you...

Страница 51: ...e parameter Operating mode of multifunction relay or Mlt OpMode and set the desired operating mode 2 Once you have set the operating mode Self consumption or SelfCsmp you can configure other settings Select the parameter Minimum On power for MFR self consumption or Mlt MinOnPwr and set the desired value This will configure the power threshold from which a load is to be activated Select the paramet...

Страница 52: ...o not want to use SMA OptiTrac Global Peak feature you can deactivate the feature The basic procedure for changing operating parameters is explained in another section see Section 8 5 Changing Operating Parameters page 49 Procedure Select the parameter Cycle time of the OptiTrac Global Peak algorithm or MPPShdw CycTms and set the required time interval The ideal time interval is usually six minute...

Страница 53: ... Red LED glowing Error If an error occurs the error message and the correspond ing event number will be shown in the display The error must be rectified by a qualified person for troubleshoot ing see the service manual at www SMA Solar com Blue LED glowing For inverters including BLUETOOTH as standard equip ment BLUETOOTH communication is activated 9 2 Display Overview The display shows the curren...

Страница 54: ...onnection In inverters with BLUETOOTH strength of BLUETOOTH signal Active connection to a Speedwire network Active connection to Sunny Portal Multifunction relay is active Power limitation due to excessive temperature Active power limitation via PV system control E Line conductor to which the displayed values apply 9 Operation SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 54 ...

Страница 55: ...th the power curve of the last 16 feed in hours or energy yields of the last 16 days In order to switch between diagrams tap once on the enclosure lid R You can operate the display by tapping on the enclosure lid see Section 9 3 page 55 The displayed error must be rectified on site by a qualified per son for troubleshooting see service manual at www SMA So lar com The displayed error cannot be rec...

Страница 56: ...ap on the enclosure lid once 9 4 Calling Up Display Messages of the Start Up Phase Various inverter information is displayed during the start up phase that can be called up whenever required during operation Procedure Tap on the enclosure lid twice The display shows all messages of the start up phase in sequence 9 Operation SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 56 ...

Страница 57: ...and remove all DC connectors To do this insert a flat blade screwdriver or an angled screwdriver blade width 3 5 mm into one of the side slots and pull the DC connectors straight out Do not pull on the cable 6 Danger to life due to high voltages The capacitors in the inverter take five minutes to discharge Wait five minutes before opening the enclosure lid 7 Ensure that no voltage is present at th...

Страница 58: ...at no voltage is present between any terminal of the multifunction relay and PE of the AC connecting terminal plate 12 Damage to the inverter due to electrostatic discharge The internal components of the inverter can be irreparably damaged by electrostatic discharge Ground yourself before touching any component 10 Disconnecting the Inverter from Voltage Sources SMA Solar Technology AG Operating Ma...

Страница 59: ...ent input A 11 A 11 A 15 A Maximum input current input B 10 A 10 A 10 A Maximum input current per string input A 11 A 11 A 15 A Maximum input current per string input B 10 A 10 A 10 A Maximum short circuit current input A 17 A 17 A 25 A Maximum short circuit current input B 15 A 15 A 15 A Maximum reverse current from the inverter in the system for max 1 ms 0 A 0 A 0 A Number of independent MPP in ...

Страница 60: ...ower 50 of the rated power 3 3 3 Maximum output current under fault conditions 12 A 15 A 17 A Rated power frequency 50 Hz 50 Hz 50 Hz AC power frequency 50 Hz 60 Hz 50 Hz 60 Hz 50 Hz 60 Hz Operating range at AC power frequency 50 Hz 45 5 Hz to 54 5 Hz 45 5 Hz to 54 5 Hz 45 5 Hz to 54 5 Hz Operating range at AC power frequency 60 Hz 55 5 Hz to 64 5 Hz 55 5 Hz to 64 5 Hz 55 5 Hz to 64 5 Hz Displacem...

Страница 61: ...al input voltage 188 V 188 V 188 V Maximum input current input A 15 A 15 A 18 A Maximum input current input B 10 A 10 A 10 A Maximum input current per string in put A 15 A 15 A 18 A Maximum input current per string in put B 10 A 10 A 10 A Maximum short circuit current in put A 25 A 25 A 25 A Maximum short circuit current input B 15 A 15 A 15 A Maximum reverse current from the in verter in the syst...

Страница 62: ...C power 50 of the rated power 3 3 3 Maximum output current under fault conditions 20 A 22 A 25 A Rated power frequency 50 Hz 50 Hz 50 Hz AC power frequency 50 Hz 60 Hz 50 Hz 60 Hz 50 Hz 60 Hz Operating range at AC power fre quency 50 Hz 45 5 Hz to 54 5 Hz 45 5 Hz to 54 5 Hz 45 5 Hz to 54 5 Hz Operating range at AC power fre quency 60 Hz 55 5 Hz to 64 5 Hz 55 5 Hz to 64 5 Hz 55 5 Hz to 64 5 Hz Disp...

Страница 63: ... string input A 18 A Maximum input current per string input B 10 A Maximum short circuit current input A 25 A Maximum short circuit current input B 15 A Maximum reverse current from the inverter in the system for max 1 ms 0 A Number of independent MPP inputs 2 Strings per MPP input 2 Overvoltage category in accordance with IEC 60664 1 II In accordance with IEC 62109 2 ISC PV AC Output STP 12000TL ...

Страница 64: ...ed to 1 to 0 8 overexcited Feed in phases 3 Phase connection 3 Overvoltage category in accordance with IEC 60664 1 III depending on the configured country data set Efficiency STP 12000TL 20 Maximum efficiency ηmax 98 2 European weighted efficiency ηEU 97 9 11 2 General Data Width x height x depth with Electronic So lar Switch 470 mm x 730 mm x 240 mm Weight of STP 5000TL 20 6000TL 20 7000TL 20 800...

Страница 65: ...cal noise emission 40 dB A Power loss in night mode 1 W Maximum data volume per inverter with Speed wire Webconnect 550 MB month Additional data volume when using the Sunny Portal live interface 600 kB hour Topology Transformerless Cooling method SMA OptiCool Fan connection Designed for safe disconnection in accordance with DIN EN 62109 Degree of protection for electronics in accor dance with IEC ...

Страница 66: ...tal and that the fault alert is activated in Sunny Portal NRS 97 2 1 This standard requires a separate label be attached to the AC distribution board to indicate the AC side disconnection of the inverter in case of a grid failure for further details see NRS 97 2 1 Sect 4 2 7 1 and 4 2 7 2 11 3 Protective Devices DC reverse polarity protection Short circuit diode Input side disconnection point Elec...

Страница 67: ...ture 11 6 Torques Enclosure lid screws 6 0 Nm 0 5 Nm Protective cover screws 2 0 Nm Additional grounding 6 0 Nm Cylindrical screw for attaching the enclosure to the wall mounting bracket 6 0 Nm SUNCLIX swivel nut 2 0 Nm 11 7 Multifunction Relay Maximum AC switching voltage 240 V Maximum DC switching voltage 30 V Maximum AC switching current 1 0 A Maximum DC switching current 1 0 A Minimum electric...

Страница 68: ...Degree of protection when plugged in IP65 Degree of protection when unplugged IP65 Fuses for Electronic Solar Switch 2 x 1000 V 4 A fast acting soldered non replaceable 11 9 Data Storage Capacity Energy yields in the course of the day 63 days Daily yields 30 years Event messages for users 250 events Event messages for installers 250 events 11 Technical Data SMA Solar Technology AG Operating Manual...

Страница 69: ...Technology AG or your distributor Designation Brief description SMA order number SMA Power Control Module Multifunction interface for implementing grid management systems for one inverter PWCBRD 10 RS485 data module RS458 interface as retrofit kit 485BRD 10 12 Accessories SMA Solar Technology AG Operating Manual 69 STP5 12TL 20 BE en 15 ...

Страница 70: ...hweiz SMA Solar Technology AG Niestetal Sunny Boy Sunny Mini Central Sunny Tripower 49 561 9522 1499 Monitoring Systems Kommunikationsprodukte 49 561 9522 2499 Fuel Save Controller PV Diesel Hybridsysteme 49 561 9522 3199 Sunny Island Sunny Boy Stor age Sunny Backup Hydro Boy 49 561 9522 399 Sunny Central Sunny Central Storage 49 561 9522 299 SMA Online Service Center www SMA Service com Belgien B...

Страница 71: ...ine Service Center www SMA Service com Italia SMA Italia S r l Milano 39 02 8934 7299 SMA Online Service Center www SMA Service com Bulgaria România Slovenija Hrvatska SMA Service Partner Renovatio Solar 40 372 756 599 SMA Online Service Center www SMA Service com United Arab Emirates SMA Middle East LLC Abu Dhabi 971 2234 6177 SMA Online Service Center www SMA Service com India SMA Solar India Pv...

Страница 72: ...Argentina Brasil Chile Perú SMA South America SPA Santiago de Chile 562 2820 2101 Australia SMA Australia Pty Ltd Sydney Toll free for Australia 1800 SMA AUS 1800 762 287 International 61 2 9491 4200 Other countries International SMA Service Line Niestetal 00800 SMA SERVICE 800 762 7378423 13 Contact SMA Solar Technology AG Operating Manual STP5 12TL 20 BE en 15 72 ...

Страница 73: ... 357 374 LVD SMA Solar Technology AG confirms herewith that the inverters described in this document are in compliance with the fundamental requirements and other relevant provisions of the above mentioned directives The entire EU Declaration of Conformity can be found at www SMA Solar com 14 EU Declaration of Conformity SMA Solar Technology AG Operating Manual 73 STP5 12TL 20 BE en 15 ...

Страница 74: ...www SMA Solar com ...