7
Commissioning
7.1
Commissioning Procedure
Before you can commission the inverter, you must check various settings and make changes if
necessary. This section describes the procedure and gives an overview of the steps, which must
always be performed in the prescribed sequence.
Procedure
See
1.
Check which country data set the inverter is set to.
Supplementary sheet with
the default settings, type la-
bel or display
2.
If the country data set is not set correctly for your country
or your purpose, adjust to the required country data set
and the corresponding display language within the first
ten feed-in hours via the rotary switches in the inverter.
Section 7.2, page 42
3.
When using BLUETOOTH communication: if the inverter is
to communicate with several BLUETOOTH devices, or if
BLUETOOTH is not to be used for communication, set the
NetID.
Section 7.3, page 43
4.
Commission the inverter.
Section 7.4, page 45
7.2
Configuring the Country Data Set
Set the country data set appropriate for your country or purpose within the first ten feed-in hours via
the rotary switches in the inverter. After the first ten feed-in hours, the country data set can only be
changed by means of a communication product.
A display language is assigned to every country data set. If the display language of the country
data set does not match the required language, you can change it after commissioning (see
Section 8.2 "Changing the Display Language", page 47).
Procedure:
1. Determine the rotary switch position for your country and purpose. Call up the Technical
Information "Overview of the Rotary Switch Settings" at www.SMA-Solar.com.
2.
Danger to life due to high voltages
• Ensure that the inverter is disconnected from all voltage sources and that the enclosure lid
is removed (see Section 10, page 57).
7 Commissioning
SMA Solar Technology AG
Operating Manual
STP5-12TL-20-BE-en-15
42
Содержание 10000TL
Страница 74: ...www SMA Solar com ...