6. If you would like to use the Modbus protocol, activate the box
Use Modbus
.
7. In the field
Modbus port
, enter the port to be used by the inverter when communicating via the Modbus
protocol. The default setting is port
502
.
8. If you would like to use a proxy server, activate the box
Use proxy server
.
9. Enter the IP address and the port of the proxy server in the field
Proxyserver address
.
10. If you would like to use the authentication of the proxy server, activate the box
Use authentication
.
11. Enter the data of your proxy server in the fields
User name
and
Password
.
12. Select the button [
Save
].
6.5.6
Detecting New Devices
During commissioning of a PV power plant, all devices must be detected. If multiple interfaces (e.g. COM2 and
COM3) are used in the inverter, detection of new devices must be carried out separately for all interfaces.
Devices will need to be redetected if you have:
• replaced devices in your PV power plant
• removed devices from your PV power plant
• added devices to your PV power plant
Detection of the PV power plant may take several minutes
Depending on the number of devices in your PV power plant, the duration of the detection process may vary.
• If there is no indication of progress on the communication unit after three minutes, cancel the search.
• Make sure the data cable of each device is properly connected and repeat the search.
Procedure:
1. Log into the user interface (see Section 12.8.1, page 177).
2. Select
Data
>
Detection
.
3. In the field
Total number of devices to be detected
, enter the number of devices connected to the
communication unit. Hint: If you do not know the number, enter
1
.
4. Select the button
[Start detection].
☑ The communication unit starts detecting all inverters and displays its progress. Once all devices have been
detected, the message
### Device detection finished ###
is displayed.
5. Select the button [
OK
].
6.5.7
Setting the Power Limitation
6.5.7.1
Setting the Active Power Ramp-Up
Parameter block
Some parameters must only be changed in the operating state "Stop". The entry will not be accepted in any other
operating state.
The inverter works up to its maximum feed-in power via a ramp. This means that the inverter gradually increases the
ratio of feed-in power per second by the value set in the parameter
WGra
.
Procedure:
1. Make sure the inverter is in the operating state "Stop".
2. Call up the parameter overview (see Section 12.8.3, page 178).
3. Set the parameter
WGra
to the required value.
4. Save the parameter changes (see Section 12.8.4, page 178).
6 Commissioning