8. Pull down the exhaust duct on both sides equally to the floor of
the station.
9. Tighten the four screws on the exhaust duct.
10. Mount the panels on the inverter cabinet (see Section 12.3.1.2, page 164).
11. Close the inverter compartment (see Section 12.1, page 159).
5.3.3
Removing the Transport Lock from the MV Transformer Compartment
In the compartment of the MV transformer, the tie-down straps must be removed and the drain orifices must be opened.
Figure 29: Position of the drain orifices in the MV transformer compartment
Position
Designation
A
Drain orifice
Risk of injury when releasing the tie-down straps
Since there is tension on the tie-down straps, there is a risk of whiplash when they are released. This can result in cuts
or crushing of limbs.
• Ensure that the tie-down straps cannot whiplash.
• Observe all manufacturer instructions on handling the tie-down straps.