![SLEIPNER MOTOR AS SRL 130/250 T Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/sleipner-motor-as/srl-130-250-t/srl-130-250-t_installation-and-user-manual_1292981026.webp)
26
SRV(P)130_170_210
1.1.8 - 2017
Example of the control wiring with S-link system for boats with
one control position and one retractable thruster.
S1
=_
__
__
pos & neg
+ ground
BB1=___
BB2=___
S2
=_
__
__
You need:
2 x 6 1327 End terminators
3 x 6 1326 T-connectors
1 x 6 1328 Power spur
2 x 6 1320-xxM Backbone cables
2 x 6 1321-xxM Spur cables
Positive, Negative
& Shield
EN
S-link planning & precautions
Routing the Backbone:
Plan routing of the backbone so that lenght of spur cables will be kept at
a minimum.
Avoid routing the S-link cables close to equipment that might cause
interference to the S-link signals, such as radio transmitter equipment,
antennas, high voltage cables etc.
The backbone MUST be terminated in each end with the 6 1327 End
Terminator.
Spur cables:
Spur cables can be left unterminated (i.e. routing can be prepared for
future additional equipment), make sure to protect open connectors from
water and moisture to avoid corrosion in connector .
Содержание SRL 130/250 T
Страница 22: ...22 SRV P 130_170_210 1 1 8 2017 Technical wiring diagram SRVP models Visual wiring diagram SRVP models...
Страница 33: ...33 SRV P 130_170_210 1 1 8 2017 Partslist SRV130 250T...
Страница 34: ...34 SRV P 130_170_210 1 1 8 2017 Partslist SRV170 250TC...
Страница 35: ...35 SRV P 130_170_210 1 1 8 2017...