![SLEIPNER MOTOR AS SRL 130/250 T Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/sleipner-motor-as/srl-130-250-t/srl-130-250-t_installation-and-user-manual_1292981015.webp)
15
SRV(P)130_170_210
1.1.8 - 2017
13. After moulding in SRF flange is completed, the up
-
per thruster case is ready to be installed.
Apply MS Polymer or equivalent on flange surface to
seal and avoid water leakage. Ensure that glue is com-
patible with SRF and thruster case materials. This is the
boatbuilder/installer full responsibility.
Fig. 14.
Fig. 14
14. Secure the upper thruster case by tightening bolts
to 4Nm/2,9lb/ft.
Fig. 15.
Fig. 15
15. In order to get correct hole alignment/pattern to
hatch do following steps:
- Fit custom made pin bolts to the tunnel rings. The ends
of the bolts must be sharp in order to create marks in
the hatch. The pin bolts must be in correct height so the
hatch will fit in its inner position.
- Place hatch in its inner position, then press or tap with
an hammer to create punch marks inside of hatch.
Fig. 16.
Fig. 16
EN
Step by step - Thruster installation - Upper thruster case and hatch fitting
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
A
A
B
B
C
C
D
D
E
E
F
F
11/10/2016
1
Designed by
Date
1 / 1
Edition
Sheet
olekr
Material Type
Steel, Mild
Drawing nr
DIN 913 - M5 x 20
Copyright All rights reserved
Part nr
Size
Scale
Title
Tolerance NS-ISO 2768-1
SLEIPNER MOTOR AS
A2
0.003 kg
Weight
Hexagon Socket Set Screw
4 x pin bolts M10x70
Part#: 11071
Содержание SRL 130/250 T
Страница 22: ...22 SRV P 130_170_210 1 1 8 2017 Technical wiring diagram SRVP models Visual wiring diagram SRVP models...
Страница 33: ...33 SRV P 130_170_210 1 1 8 2017 Partslist SRV130 250T...
Страница 34: ...34 SRV P 130_170_210 1 1 8 2017 Partslist SRV170 250TC...
Страница 35: ...35 SRV P 130_170_210 1 1 8 2017...