E_MH_Mounting_instructions_Skylux_Climaglide_10mm_carrier_system
10/09/2021
12/16
Bottom rail (CGB)
The single system with sliding lock only has drainage holes.
The double system has 2 holes in the bottom rail to lock the sliding elements. These holes are positioned in the
central inside part of the bottom rail.
Make sure the horizontally drilled drainage holes are pointing outwards and the locking holes at the end match.
See drawing below.
Single system – with sliding lock
Double system with 6,8,10 glass
Pre-drill the lower rail with Ø 6 mm to 4 cm from the ends and also with a spacing of approximately 70 cm in the
indication lines between the outermost tracks. Give each hole a chamfer so that the screw head is sunk. Then
screw the profile onto the base with suitable screws and plugs. Provide a small water barrier with silicone at 15 mm
from the inner edge between the lower rail and the surface. Make sure the lower rail lies perfectly beneath the
upper rail and is level. If necessary, shims must be used to align the lower rail horizontally.
CGB3
CGB4
CGB5
water drainage
OUTSIDE
INSIDE
water drainage
water drainage
water drainage
OUTSIDE
INSIDE
water drainage
water drainage
hole for lock CGPLL10
hole for lock CGPLL10