38
SKYBLADE FANS -
Where Form Follows Function
10
Electrical Installation
10.2 Wire Connection Procedure:
1.
Strip the motor cable and twist the shield under the grounding clamp. Connect the phase conductors to the
U2, V2, and W2 terminals. Use a tightening torque of 0.8 Nm. (7 lbf-in) for frame sizes R0...R2, 1.7 Nm (15lbf-
in) for R3, and 2.5 Nm (22 lbf-in) for R4.
2.
Secure the cables outside the drive mechanically.
1
2
2
Job Site Installed
Factory Installed