1616-920-03
8/28/2014
Rev: B
1
4
POST INSTALLATION CONFIGURATION
No testing can occur until a transceiver is activated. The customer is responsible for
this activation as the customer receives the bills for the phone use. This process
should be done in advance of the installation/testing.
IMPORTANT NOTE
The MMU II comes from the factory with a default Message Set
(MSet) loaded to allow the installer to perform testing right
out of the box.
The END USER MUST! load their own MSet in order to make
the MMU II function as they desire. Creation of the customer’s
MSet is the responsibility of the customer, and must be done
with MSet Manage Software.
4.1
MMU II CONFIGURATION
Prior to testing, assure te MMU II is configured correctly for the transceiver and
functions that will be required.
Entering Installer Configuration mode is one CCW pushed‐in detent of the rotary
knob while pressing the ‘*’ key from either the Ready page, or from the initial MMU
II splash display page. The following parameters may be set in Configuration mode:
4.1.1 Config Version ‐ Internal use, for informational purposes. This description is valid
for Config Version 2.