8.3 Measures following completed
maintenance
Upon completion of the maintenance work, the following steps
should be performed prior to restarting the device.
1
Check all previously loosened screw connections for a tight fit.
2
Ensure that all used tools, materials and other equipment have
been removed from the work area.
3
Clean work area and remove potential spills such as liquids, pro-
cessing materials or similar substances.
4
Ensure that all the system’s safety measures are working
satisfactorily.
5
Check all functions against the product specifications.
6
Document the inspections in the service log.
45
www.lmotion.ru
Тел
.: (495)-921-34-60