37
GB
TRANSPORTATION AND STORAGE
TRANSPORTING THE UNIT
To move the unit, lift it from the solid wood base (6)
until the wheels (2) touch the floor.
This way you can easily roll the unit from place to
place.
STORAGE
1. Store the rowing machine vertically after working out to
save space. Empty the tank if it to be stored upright for
more than 2 weeks to avoid algae forming in the stagnant
water.
2. Watch your head when standing the unit upright - you
could bump the rear stand!
3. Caution! Before setting up the unit in the vertical positi-
on, please push the seat all the way forward to the final
position!
Содержание SF-2472
Страница 1: ...Styrke II Designed by TUKiENDORF DESIGN GERMANY DE GB FR Art Nr SF 2472 SF 2473 ...
Страница 4: ...4 EXPLOSIONSZEICHNUNG ...
Страница 5: ...5 DE EXPLOSIONSZEICHNUNG ...
Страница 24: ...24 EXPLOSIONS DRAWING ...
Страница 25: ...25 GB EXPLOSION DRAWING ...
Страница 27: ...27 GB CHECK LIST 9 iPad holder x1 7 adjustable foot pad x2 25 Siphon pump x1 15 Bluetooth module x1 ...
Страница 44: ...44 VUE ÉCLATÉE ...
Страница 45: ...45 FR VUE ÉCLATÉE ...