background image

Fig.20

-

Pay special attention to the proper installation of the tubes into the prepared holes in the wall to avoid

damaging them.

-

Make sure that the locking bolts (M6x25) are properly tightened with the maximum force of 5 Nm, so
that the fitting sits on the installation template with its entire rear surface. Otherwise, there is a risk of
increased noise and incorrect function of the unit.

3.2.8.2. Water heater variant(XR1-xxx-ECV1...)

-

Leave the unit inserted on the installation pins at a distance of approximately 100 mm from the wall.

-

Connect flexible hoses ended with an external G ¾" thread on the mixing valve (not included in the
delivery). To distinguish the inlet and outlet of the heating water, the ends of the flexible hoses are
marked with red (hot water inlet) and blue (return) dots.

-

To ensure a flexible hose against turning when tightening, use size 27 wrench. This prevents the flexible

hoses and outlets from the heat exchanger from turning, which can result in irreversible damage to the

hoses, fitting, and water exchanger.

ATTACH THE UNIT TO THE INSTALLATION PINS USING M6x25  

A BOLTS

TIGHTEN WITH APPROPRIATE STRENGTH – MAX 5 Nm

3

ATTACH HOSES TO VALVE AND TIGHTEN PROPERLY USING SUITABLE TOOLS

1

30

Version 1 – GBR(23/06/2021)

D-502-0152

Fig.21

-

After connecting the water exchanger to the heating system, a pressure test of the unit connection is  

recommended.

-

The tests must be carried out by a person qualified in this field with knowledge of the applicable
regulations and standards of the country concerned.

Содержание XROOM

Страница 1: ...OPERATING AND INSTALLATION MANUAL RECOVERY AND HEATING UNIT XROOM 1 Version 1 GBR 23 06 2021 D 502 0152...

Страница 2: ...tting position 4 11 Unit cover position 5 11 Reinforcement position 6 11 Bolt M6x30 position 7 11 Filters position 8 12 2 1 9 Filter caps position 9 12 2 1 10 Preheating position 10 12 2 1 11 Fans pos...

Страница 3: ...3 Installation Template Mounting 23 3 2 3 Preparation of Piping Holes in the Existing Wall 24 3 2 4 Preparation of Supply and Drain Piping 25 3 2 4 1 Extension of piping for walls with a thickness gre...

Страница 4: ...y in the electric version XR1 xxx ECE1 41 5 4 6 5 4 7 5 4 8 Setting the RequiredTemperature 41 Display of the IndicatedStatuses on the Controller by LEDs 41 Hidden RegulationFunctions 42 5 4 9 Automat...

Страница 5: ...serve the right to change this manual without prior notice Children and persons with reduced physical sensory or mental capabilities or lack of experience and knowledge may use the unit only under sup...

Страница 6: ...tion but also for space with heating requirements ventilation and heating are independent of each other In case of type configuration with o Electric heating the unit is equipped with advanced regulat...

Страница 7: ...eck for any traces of damage on the packaging If the packaging is damaged write a record of the damage and contact your carrier please Check if you have received the product actually ordered by you Af...

Страница 8: ...we recommend that you attach the serial plate by default supplied with the package to the operating documentation e g equipment operating book etc which is subsequently kept for a later maintenance r...

Страница 9: ...2 Technical Parameters 1 Design of the Xroom unit 1 2 3 4 6 7 5 Fig 1 9 Version 1 GBR 23 06 2021 D 502 0152...

Страница 10: ...Fig 2 8 9 13 14 10 11 12 15 16 17 19 19 23 10 Version 1 GBR 23 06 2021 D 502 0152...

Страница 11: ...ody of the unit is made of black pressed EPP plastic expanded polypropylene It ensures the accuracy and repeatability of the installation of components The material itself is an advanced technical mat...

Страница 12: ...to control the entire unit 2 1 15 Regulator box position15 It ensures interconnection of the individual components and also serves for the customer s connection 2 1 16 FILTER RESET button position16...

Страница 13: ...Fig 3 2 2 Main dimensions of the Xroom unit 2 2 1 Xroom 100 XR1 010 EC 2 2 2 Xroom 250 XR1 025 EC Fig 3 13 Version 1 GBR 23 06 2021 D 502 0152 Fig 4...

Страница 14: ...minal airflow BOOST m3 h 90 205 Heat output range of heating kW 0 29 1 24 0 5 0 29 1 24 0 5 Noise level dB A 32 1 Weight kg 16 3 18 3 19 3 16 8 18 8 19 8 Water volume in exchanger l 0 51 0 51 Power su...

Страница 15: ...nit equipment pre heater electric electric electric after heater water electric water electric Nominal airflow BOOST m3 h 240 335 Heat output range of heating kW 1 34 3 49 1 1 34 3 49 1 Noise level dB...

Страница 16: ...cessibility of exterior sound 2 3 3 Technical data of waterheaters XR1 01 ECV1HR heat recovery exchanger XR1 010 ECV1ER enthalpy recovery exchanger XR1 025 ECV1HR heat recovery exchanger 16 Version 1...

Страница 17: ...Tab13 Tab 14 XR1 025 ECV1ER enthalpy recovery exchanger 2 3 4 Heat and moisture recoveryefficiency XR1 010 EC 17 Version 1 GBR 23 06 2021 D 502 0152...

Страница 18: ...electrical connection point wiring box outlet meets the unit s power supply requirements voltage current etc specified on the unit s serial plate The electrical quantities necessary for the unit s op...

Страница 19: ...1 2 3 4 5 6 7 19 Version 1 GBR 23 06 2021 D 502 0152 Fig 5...

Страница 20: ...tallation accessories is carried out gradually according to the installation work course as specified in this manual Package Content Description Box 2 A Plastic white tube 125 mm XR1 010 DUCT 1 or 150...

Страница 21: ...me amount of air is supplied and discharged and can in no way replace a separate air supply to the furnace For proper operation of the furnace and the unit consult the location with the chimney sweep...

Страница 22: ...health and property of the user Take special care when draining the condensate using a condensation sump not a part of the supply into the sewerage piping The unit manufacturer accepts no liability fo...

Страница 23: ...ench Save the mounting pins for future use Fig 9 3 2 2 1 Fitting the installation template on the wall when using the construction module If you used a building module XR1 xxx DUCT 1 to build the wall...

Страница 24: ...red holes in the installation template to correctly align the piping holes The installation template is also used as a drilling template Do not remove the installation template when drilling the pipin...

Страница 25: ...on 3 2 4 1 Measure the total wall thickness with the thickness of the installation template through the drilled hole the thickness of the installation template itself is 2 mm From box 2 installation a...

Страница 26: ...ll thickness is over 600 mm If the total wall thickness does not allow for the minimum length of the extension tube to be 100 mm i e wall thickness is between 500 and 600 mm a part of the tube from th...

Страница 27: ...nto the lower socket of the unit by turning it back and forth while pushing it down into the groove After fitting the pipe onto the lower socket check its perpendicularity to the rear part of theunit...

Страница 28: ...nstalled piping with self tapping bolts 4 x 22 mm against each other as shown in Fig 15 4 at a distance of 20 mm from the edge of the unit see Fig 16 3 2 6 Gluing Insulating Pads For proper sealing of...

Страница 29: ...nt cover 3 2 8 Xroom Unit Final Fitting Partly slide the removed unit onto the installation template pins Connect the ground wire connector to the grounding point of the installationtemplate to achiev...

Страница 30: ...e inlet and outlet of the heating water the ends of the flexible hoses are marked with red hot water inlet and blue return dots To ensure a flexible hose against turning when tightening use size 27 wr...

Страница 31: ...th adequate force BUT MAX 5 Nm so that the fitting sits with its entire rear surface on the installation template Otherwise there is a risk of increased noise and incorrect function of the unit 3 2 9...

Страница 32: ...ge through the outlet 3 2 11 Installation of the Front MetalCover Bolt in the M6x20 bolts with the plastic head part of the delivery in a bag about 10 mm to the bottom of the unit o Xroom 100 size 2 p...

Страница 33: ...ves in the country Before starting any installation work it is necessary to switch off the power supply During the installation the switch must be secured against being switched on again by an unautho...

Страница 34: ...on for this activity and knowledge of the relevant standards and directives in the given country 3 3 2 2 Connecting the Unit to the Electrical Outlet The supply cable can be equipped with a fork with...

Страница 35: ...e button Then retract the wire release the lock and slightly pull it out of the terminal to verify that the wire is properly secured If the wire needs to be removed from the terminal the procedure is...

Страница 36: ...oom radon concentration is not achieved the control of the unit increases the flow up to the maximum flow value set by the user o the control of the unit starts to decrease the flow rate continuously...

Страница 37: ...on off by an external contact it can be switched off on by the controller on the unit An example of the external contact functioning a timer is used as an external contact o EXT1 activates the unit a...

Страница 38: ...rrows until the blue status diode left button for the version with electric heating XR1 xxx ECE1 is lit approx 3 sec right button for the version with water heating XR1 xxx ECV1 and without heating co...

Страница 39: ...of some functions is only possible from this mode The setting mode is activated by clicking on the button for which the function is to be changed The plus and minus button is intended for activation...

Страница 40: ...5 4 2 Description of the functions of the buttons and regulation Tab17 40 Version 1 GBR 23 06 2021 D 502 0152...

Страница 41: ...umstances be regarded as binding 6 Setting the Required Temperature 1 In regular mode double click on button 1 or 2 or 3 to enter the settings mode LED 10 flashes fan pictogram 2 As long as the LED 10...

Страница 42: ...concentration or complete ventilation of the substance being monitored o When the concentration is reduced to a specified value ventilation is switched off and the unit is switched to the standby mode...

Страница 43: ...ot switch off the unit to replace the filter Safe disconnection of electrical parts is provided by the integrated limit switch position 18 After release removal of the front metal cover position 17 th...

Страница 44: ...tdown Press and hold the red white FILTER RESET button until the red LED on the controller switches off approx 2 sec o If the control flashes the error message fan error 11 or 12 see Section 8 1 ignor...

Страница 45: ...e or the manufacturer Regular maintenance must include o visual inspection of the unit casing Section 7 1 o visual inspection of the supply cable Section 7 1 2 o visual inspection and cleaning of the...

Страница 46: ...imit its functions Remove the front metal cover position 1 see Section 6 1 1 and 2 Remove the M6x25 bolts that hold the unit cover position 5 o XR1 010 EC o XR1 025 EC 7 pc 9 pc Slide out the unit cov...

Страница 47: ...if the unit is not equipped with preheating to prevent damage to the return damper located in the piping with a common cleaning agent e g soapy water VACUUM THE DRAINAGE PIPING AND WIPE IT FROM OUTSID...

Страница 48: ...it so that the bottom edge of the cover and the top edge of the rail of the unit are pressed together Return the M6x25 bolts to secure the cover ANTI FREEZE SENSOR POSITION TURN THE FANS BACK AND INSE...

Страница 49: ...ed professionally trained worker and only using original spare parts The manufacturer reserves the right to make changes to the device that do not affect the essential properties of the device 8 1 Err...

Страница 50: ...sponsible for electrical waste collection Please return all unwanted or obsolete products and packaging to the relevant recycling sites where they will be disposed of professionally Dispose of the par...

Отзывы: