Fig. 13
-
If necessary, use the marks on the installation template to determine the centre of the holes
Fig.12
-
It is essential that the axis of the drilled hole is horizontal and 90° to the inner surface of the
circumferential wall.
-
Be sure to observe the diameter of the drilled holes in the wall. Otherwise, there is a real risk of
incorrect installation and, consequently, poor functionality of the unit.
3.2.4. Preparation of Supply and Drain Piping
-
The installation accessories, which are always supplied with the unit as mandatory accessories, are for
walls with the maximum thickness of 0.5 m.
-
Extension of the piping for walls with a thickness greater than 0.5 m is solved in Section 3.2.4.1.
-
Measure the total wall thickness with the thickness of the installation template through the drilled hole
(the thickness of the installation template itself is 2 mm).
-
From box 2 – installation accessories, remove 1 pc “supply piping assembly with damper
Ø
125 mm,
(Xroom250
Ø
150 mm), length 500 mm” – position D.
-
Transfer the measured length to the supply piping assembly with damper where the measurement starts
from the side where the damper and orientation blue point are located.
-
From box 2 – installation accessories, remove “white plastic tube, length 500 mm” – position A.
-
Transfer the measured length (wall thickness) to the other piece of plastic tube.
-
Cut the supply pipe assembly with damper and the second pipe.
BE SURE TO KEEP THE
HOLE CENTRE
CORE DRILL – DRILL AXIS 90° WITH WALL!!!
1
2
4
5
SUPPLY BRANCH (UPPER PIPING)
3
6
EXTRACT BRANCH (LOWER PIPING)
25
Version 1 – GBR(23/06/2021)
D-502-0152
Содержание XROOM
Страница 10: ...Fig 2 8 9 13 14 10 11 12 15 16 17 19 19 23 10 Version 1 GBR 23 06 2021 D 502 0152...
Страница 19: ...1 2 3 4 5 6 7 19 Version 1 GBR 23 06 2021 D 502 0152 Fig 5...
Страница 40: ...5 4 2 Description of the functions of the buttons and regulation Tab17 40 Version 1 GBR 23 06 2021 D 502 0152...