If you carry out the installation into the wall with a thickness greater than 500 mm, get also thematerial:
o
Plastic air-conditioning piping with a length greater than the wall thickness:
Xroom 100 (XR1-010...) piping diameter 125 mm
Xroom 250 (XR1-025...) piping diameter 125 mm
2 pc
2 pc
o
Direct coupling – insert
Xroom 100 (XR1-010...) piping diameter 125 mm
Xroom 250 (XR1-025...) piping diameter 125 mm
o
Aluminium air-conditioning tape or other one for the same purpose
2 pc
2 pc
1 pc
3.2.2. Fitting and Mounting the Installation Template with Mounting Pins
-
Make sure that you have complied with all the principles necessary for correct installation specified in
this manual:
-
Pull the installation template with pins upwards from box 1,
-
Close the box with the remaining unit components and place it at a safe distance from the assembly site
to prevent its damage by dust from the construction work during the installation,
-
Remove the mounting pins; if the mounting pins cannot be removed by hand, use a size 8 wrench,
-
Save the mounting pins for future use
Fig.9
3.2.2.1.
Fitting the installation template on the wall when using the construction module
-
If you used a building module (XR1-xxx-DUCT-1) to build the wall, on which the unit will be located,
proceed as follows:
o
Remove the plugs from the construction module (cylinder) approx. 20 mm into the room
o
Insert the installation template through the circular holes in the template on the plugs removed
from the construction case
o
Continue the installation as per 3.2.2.3
3.2.2.2.
Fitting the Installation Template on the Existing Wall
-
Place the installation template at the desired location.
-
Measure the required distances of the unit from the fixed surfaces while observing the minimum
installation clearances specified in Section 3.1.4.
-
Continue the installation as per 3.2.2.3
3.2.2.3.
Installation Template Mounting
-
Use a spirit level to level the template,
o
If necessary, the top nuts for the mounting pins can be used to adjust the spirit level. Make sure the
level is correctly laid on the nuts.
-
Mark all the mounting holes for installation of the template on the wall,
2
1
3
LOOSEN WITH
HAND OR KEY 8
AND REMOVE
4
23
Version 1 – GBR(23/06/2021)
D-502-0152
Содержание XROOM
Страница 10: ...Fig 2 8 9 13 14 10 11 12 15 16 17 19 19 23 10 Version 1 GBR 23 06 2021 D 502 0152...
Страница 19: ...1 2 3 4 5 6 7 19 Version 1 GBR 23 06 2021 D 502 0152 Fig 5...
Страница 40: ...5 4 2 Description of the functions of the buttons and regulation Tab17 40 Version 1 GBR 23 06 2021 D 502 0152...