© Jul.2020
4-14
GTJZ0612E&0812E&1012E&1212E Maintenance Manual
A-18 Perform Maintenance After 30
Days
Perform maintenance on a new machine after the
machine is operated for 30 days or 40 hours. After
performing the 30-day maintenance, continue
performing maintenance as scheduled.
Perform the following procedures:
•
B-2 Inspect rims, tires and fasteners.
•
D-3 Replace hydraulic oil tank return oil filter
element.
CHECKLIST B
PROCEDURES
B-1 Inspect Electric Wires
The maintenance of electric wires is important for
proper and safe operation of the machine. Serious
injury and unsafe operation of the machine could occur
if you allow the machine to continue to operate with
damaged and corroded wires. Replace or repair
damaged or corroded wires before operating the
machine.
ELECTRICAL SHOCK HAZARD
Be sure to disconnect the battery
from the machine and the charger
from the AC outlet before inspecting
electrical wires. Contacting live wire
conductors could result in death or
serious injury.
1.
Inspect electrical wires for damage or corrosion in
the following areas:
•
Battery harness
•
Charger harness
•
Scissor arm harness
•
Power unit harness
•
Ground controller junction box
•
Platform controller junction box
2.
Inspect the flexile joints, and confirm that the joints
are tight and the sensor lines are not damaged.
B-2 Inspect Rim, Tire and Fasteners
Good maintenance of rims and tires is important for the
safe operation of the machine. The machine might tip
over if the rim or the tire has problems. Repair any prob-
lems with the rims and tires before operating the
machine.
The machine is equipped with solid tires that do not
need to be inflated.
1.
Inspect for cuts, cracks, puncture or abnormal wear
patterns on all tires.
2.
Inspect and verify that all rims are not damaged or
deformed and that no welding cracks exist.
3.
Remove the cotter pin, inspect it and confirm that
the mounting nuts have been tightened with the cor-
rect torque.
Содержание GTJZ0612E
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Jul 2020 iv GTJZ0612E 0812E 1012E 1212E Maintenance Manual This Page Intentionally Left Blank...
Страница 86: ...Jul 2020 5 28 GTJZ0612E 0812E 1012E 1212E Maintenance Manual MAINTENANCE PROCEDURES...