
Control
Page 73 Total 145
[Notes]:
● The error log can accommodate up to 20 pieces of error. Name and occurrence time are available for
each error.
● When error log exceeds 20, the latest will supersede the earliest.
3.2.5.5 Version Viewing
[Operation Instructions]
★
At the “
VIEW
” page, by touching “
Version
”, the control panel will go to the version view page, where
it is able to view both the program version and protocol version.
3.2.6 General Setting
[Operation Instructions]
★
1. At the menu page, by touching “
GENERAL
”, the control panel will go to the setting page, as shown
in the figure below, where it is able to set “
Temp.unit
”, “
On/off memory
”, “
Beeper
”, “
Back light
”,
“
Time & Date
” and “
Language
”.
General Setting Page
Содержание S-THERM GSH-100ERB
Страница 5: ...Engineering Data Page 1 Total 145 ENGINEERING DATA...
Страница 15: ...Engineering Data Page 12 Total 145 2 Outline Dimensions GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 16: ...Engineering Data Page 13 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 18: ...Engineering Data Page 15 Total 145 SMH 80ERB...
Страница 21: ...SMH 100ERB Engineering Data...
Страница 23: ...SMH 60IRB...
Страница 24: ...SMH 60ERB...
Страница 26: ...Design and Selection Page 19 Total 145 DESIGN SELECTION...
Страница 40: ...Control Page 33 Total 145 UNIT CONTROL...
Страница 41: ...Control Page 34 Total 145 1 Integral Control Concept 1 1 Control Principle Diagram Control Diagram...
Страница 83: ...Control Page 76 Total 145 2 Open Ewpe Smart APP and click Sign up for registration...
Страница 85: ...Control Page 78 Total 145 4 Click at the right upper corner of homepage to add device...
Страница 88: ...Control Page 81 Total 145 3 3 2 Setting of Main Functions 1 Set mode and temperature...
Страница 91: ...Control Page 84 Total 145...
Страница 92: ...Control Page 85 Total 145 3 3 3 2 Help Click Help and view the operation instructions of the APP...
Страница 93: ...Control Page 86 Total 145 3 3 3 3 Feedback Click Feedback to submit feedback...
Страница 94: ...Unit Installation Page 87 Total 145 UNIT INSTALLATION...
Страница 98: ...Unit Installation Page 91 Total 145 3 Service Tools Name Picture Spanner Screw Driver Pliers Tube Tongs...
Страница 103: ...Unit Installation Page 96 Total 145 4 4 Outline Dimension of Outdoor Unit GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 104: ...Unit Installation Page 97 Total 145 GSH 60ERB GSH 80IRB GSH 100IRB...
Страница 112: ...Unit Installation Page 105 Total 145 4 6 4 Outline dimension of indoor unit...
Страница 118: ...Unit Installation Page 111 Total 145...
Страница 125: ...Unit Installation Page 118 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 126: ...Unit Installation Page 119 Total 145 4 11 Wiring of the Terminal Board GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 135: ...Test Operation Troubleshooting Maintenance Page 128 Total 145 TEST OPERATION TROUBLESHOOTING MAINTENANCE...