Unit Installation
Page 125 Total 145
5 Commissioning and Trial Run
5.1 Check before startup
For safety of users and unit, the unit must be started up for check before debugging. The procedures
are as below:
The following items shall be performed by qualified repair persons.
Confirm together with the sales engineer, dealer, installing contractor and customers for the following items finished or to
be finished.
No.
Confirmation of Installation
√
1
If the contents of Application for Installation of this Unit by Installer are real. If not, debugging will be
refused.
□
2
Is there written notice in which amendment items are shown in respect of unqualified installation?
□
3
Are Application for Installation and Debugging list filed together?
□
No.
Pre-check
√
1
Is appearance of the unit and internal pipeline system ok during conveying, carrying or installation?
□
2
Check the accessories attached with the unit for quantity, package and so on.
□
3
Make sure there is drawings in terms of electricity, control, design of pipeline and so on.
□
4
Check if installation of the unit is stable enough and there is enough space for operation and repair.
□
5
Completely test refrigerant pressure of each unit and perform leakage detection of the unit.
□
6
Is the water tank installed stably and are supports secure when the water tank is full?
□
7
Are heat insulating measures for the water tank, outlet/inlet pipes and water replenishing pipe proper?
□
8
Are the nilometer of water tank, water temperature indicator, controller, manometer, pressure relief
valve and automatic discharge valve etc. installed and operated properly?
□
9
Does power supply accord with the nameplate? Do power cords conform to applicable requirements?
□
10
Is power supply and control wiring connected properly according to wiring diagram? Is earthing safe? Is
each terminal stable?
□
11
Are connection pipe, water pump, manometer, thermometer, valve etc. are installed properly?
□
12
Is each valve in the system open or closed according to requirements?
□
13
Confirm that the customers and inspection personnel of Part A are at site.
□
14
Is Installation Check-up Table completed and signed by the installation contractor?
□
Attention: If there is any item marked with ×, please notify the contractor. Items listed above are just for reference.
Con
fi
rm
e
d
I
te
m
s
a
fte
r
p
re
-c
h
e
c
k
in
g
General Evaluation: Debugging □ Amendment □
Judge the following items (if there is not any filling, qualification will be regarded.)
a: Power supply and electric control system b: Loading calculation
c: Heating problems of Unit d: Noise problem
e: Pipeline problem f: Others
Содержание S-THERM GSH-100ERB
Страница 5: ...Engineering Data Page 1 Total 145 ENGINEERING DATA...
Страница 15: ...Engineering Data Page 12 Total 145 2 Outline Dimensions GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 16: ...Engineering Data Page 13 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 18: ...Engineering Data Page 15 Total 145 SMH 80ERB...
Страница 21: ...SMH 100ERB Engineering Data...
Страница 23: ...SMH 60IRB...
Страница 24: ...SMH 60ERB...
Страница 26: ...Design and Selection Page 19 Total 145 DESIGN SELECTION...
Страница 40: ...Control Page 33 Total 145 UNIT CONTROL...
Страница 41: ...Control Page 34 Total 145 1 Integral Control Concept 1 1 Control Principle Diagram Control Diagram...
Страница 83: ...Control Page 76 Total 145 2 Open Ewpe Smart APP and click Sign up for registration...
Страница 85: ...Control Page 78 Total 145 4 Click at the right upper corner of homepage to add device...
Страница 88: ...Control Page 81 Total 145 3 3 2 Setting of Main Functions 1 Set mode and temperature...
Страница 91: ...Control Page 84 Total 145...
Страница 92: ...Control Page 85 Total 145 3 3 3 2 Help Click Help and view the operation instructions of the APP...
Страница 93: ...Control Page 86 Total 145 3 3 3 3 Feedback Click Feedback to submit feedback...
Страница 94: ...Unit Installation Page 87 Total 145 UNIT INSTALLATION...
Страница 98: ...Unit Installation Page 91 Total 145 3 Service Tools Name Picture Spanner Screw Driver Pliers Tube Tongs...
Страница 103: ...Unit Installation Page 96 Total 145 4 4 Outline Dimension of Outdoor Unit GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 104: ...Unit Installation Page 97 Total 145 GSH 60ERB GSH 80IRB GSH 100IRB...
Страница 112: ...Unit Installation Page 105 Total 145 4 6 4 Outline dimension of indoor unit...
Страница 118: ...Unit Installation Page 111 Total 145...
Страница 125: ...Unit Installation Page 118 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 126: ...Unit Installation Page 119 Total 145 4 11 Wiring of the Terminal Board GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 135: ...Test Operation Troubleshooting Maintenance Page 128 Total 145 TEST OPERATION TROUBLESHOOTING MAINTENANCE...