
Control
Page 60 Total 145
3.2.4.2 2-Way valve
[Operation Instructions]
★
At the commissioning parameter setting page, by touching “
Cool 2-Way valve
” or “
Heat 2-Way
valve
”, the control panel will access to the corresponding setting page.
[Notes]
●Under “
Cool
”, or “
Cool + Hot water
” mode, “
Cool 2-Way valve
” will decide the status of the 2-way
valve; while under “
Heat
” or “
Heat + Hot water
”, “
Heat 2-Way valve
” will decide the status of the 2-way
valve.
●It will be memorized upon power failure.
3.2.4.3 Solar Setting
[Operation Instructions]
★
1. At the commissioning parameter setting page, by touching “
Solar setting
”, the control panel will
access to its submenu page.
★
2. At the submenu page, “
Solar setting
” can be set to “
With
” or “
Without
”.
★
3. At the submenu page, the “
Solar heater
” can be set to “
On
” or “
Off
”.
Solar Setting
[Notes]
●This setting can be done no matter if the unit is turned on or off.
●This setting is allowed only when the water tank is available. When the water tank is unavailable, this
setting will be reserved.
●It will be memorized upon power failure.
3.2.4.4 Water Tank
[Operation Instructions]
★
At the commissioning parameter setting page, by touching “
Water tank
”, the control panel will
access to the corresponding setting page, where “
Water tank
” can be set to “
With
” or “
Without
”.
[Notes]
●This setting will be memorized upon power failure.
●This setting will become valid only when the unit is turned off.
3.2.4.5 Thermostat
[Operation Instructions]
★
1. At the commissioning parameter setting page, by touching “
Thermostat
”, the control panel will
access to the corresponding setting page.
★
2. At the
“
Thermostat
” setting page, it can be set to “
Air
”, “
Without
” or “
Air + hot water
”. When it is
set to “
Air
” or “
Air + hot water
”, the unit will run based on the mode set by the thermostat; when it
is set to “
Without
”, the unit will run based on the mode set by the control panel.
Содержание S-THERM GSH-100ERB
Страница 5: ...Engineering Data Page 1 Total 145 ENGINEERING DATA...
Страница 15: ...Engineering Data Page 12 Total 145 2 Outline Dimensions GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 16: ...Engineering Data Page 13 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 18: ...Engineering Data Page 15 Total 145 SMH 80ERB...
Страница 21: ...SMH 100ERB Engineering Data...
Страница 23: ...SMH 60IRB...
Страница 24: ...SMH 60ERB...
Страница 26: ...Design and Selection Page 19 Total 145 DESIGN SELECTION...
Страница 40: ...Control Page 33 Total 145 UNIT CONTROL...
Страница 41: ...Control Page 34 Total 145 1 Integral Control Concept 1 1 Control Principle Diagram Control Diagram...
Страница 83: ...Control Page 76 Total 145 2 Open Ewpe Smart APP and click Sign up for registration...
Страница 85: ...Control Page 78 Total 145 4 Click at the right upper corner of homepage to add device...
Страница 88: ...Control Page 81 Total 145 3 3 2 Setting of Main Functions 1 Set mode and temperature...
Страница 91: ...Control Page 84 Total 145...
Страница 92: ...Control Page 85 Total 145 3 3 3 2 Help Click Help and view the operation instructions of the APP...
Страница 93: ...Control Page 86 Total 145 3 3 3 3 Feedback Click Feedback to submit feedback...
Страница 94: ...Unit Installation Page 87 Total 145 UNIT INSTALLATION...
Страница 98: ...Unit Installation Page 91 Total 145 3 Service Tools Name Picture Spanner Screw Driver Pliers Tube Tongs...
Страница 103: ...Unit Installation Page 96 Total 145 4 4 Outline Dimension of Outdoor Unit GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 104: ...Unit Installation Page 97 Total 145 GSH 60ERB GSH 80IRB GSH 100IRB...
Страница 112: ...Unit Installation Page 105 Total 145 4 6 4 Outline dimension of indoor unit...
Страница 118: ...Unit Installation Page 111 Total 145...
Страница 125: ...Unit Installation Page 118 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 126: ...Unit Installation Page 119 Total 145 4 11 Wiring of the Terminal Board GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 135: ...Test Operation Troubleshooting Maintenance Page 128 Total 145 TEST OPERATION TROUBLESHOOTING MAINTENANCE...