Unit Installation
Page 101 Total 145
4.5.6 Safety operation of flammable refrigerant
(1) Qualification requirement for installation and maintenance of Hydraulic Unit
All the work men who are engaging in the refrigeration system should bear the valid certification
awarded by the authoritative organization and the qualification for dealing with the refrigeration
system recognized by this industry.
If it needs other technician to maintain and repair the appliance, they should be supervised by the
person who bears the qualification for using the flammable refrigerant. It can only be repaired by the
method suggested by the equipment’s manufacturer.
(2) Installation notes
The unit is not allowed to use in a room that has running fire (such as firesource, working coal gas
ware, operating heater).
It is not allowed to drill hole or burn the connection pipe.
The unit must be installed in a room that is larger than the minimum room area. The minimum room
area is shown on the nameplate or following table a.
Leak test is a must after installation.
(3) Maintenance notes
Check whether the maintenance area or the room area meet the requirement.
-
It’s only allowed to be operated in the rooms that meet the requirement.
Check whether the maintenance area is well-ventilated.
- The continuous ventilation status should be kept during the operation process.
Check whether there is fire source or potential fire source in th e maintenance area.
-
The naked flame is prohibited in the maintenance area; and the “no smoking” warning board
should be hanged.
Check whether the appliance mark is in good condition.
- Replace the vague or damaged warning mark.
(4) Welding
If you should cut or weld the refrigerant system pipes in the process of maintaining, please follow
the steps as below:
a. Shut down the unit and cut power supply
b. Eliminate the refrigerant
c. Vacuuming
d. Clean it with N2 gas
e. Cutting or welding
f. Carry back to the service spot for welding
The refrigerant should be recycled into the specialized storage tank.
Make sure that
there isn’t any naked flame near the outlet of th e vacuum pump and it’s
well-ventilated.
(5) Filling the refrigerant
Use the refrigerant filling appliances specialized for R32. Make sure that different kinds of
refrigerant won’t contaminate with each other.
Содержание S-THERM GSH-100ERB
Страница 5: ...Engineering Data Page 1 Total 145 ENGINEERING DATA...
Страница 15: ...Engineering Data Page 12 Total 145 2 Outline Dimensions GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 16: ...Engineering Data Page 13 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 18: ...Engineering Data Page 15 Total 145 SMH 80ERB...
Страница 21: ...SMH 100ERB Engineering Data...
Страница 23: ...SMH 60IRB...
Страница 24: ...SMH 60ERB...
Страница 26: ...Design and Selection Page 19 Total 145 DESIGN SELECTION...
Страница 40: ...Control Page 33 Total 145 UNIT CONTROL...
Страница 41: ...Control Page 34 Total 145 1 Integral Control Concept 1 1 Control Principle Diagram Control Diagram...
Страница 83: ...Control Page 76 Total 145 2 Open Ewpe Smart APP and click Sign up for registration...
Страница 85: ...Control Page 78 Total 145 4 Click at the right upper corner of homepage to add device...
Страница 88: ...Control Page 81 Total 145 3 3 2 Setting of Main Functions 1 Set mode and temperature...
Страница 91: ...Control Page 84 Total 145...
Страница 92: ...Control Page 85 Total 145 3 3 3 2 Help Click Help and view the operation instructions of the APP...
Страница 93: ...Control Page 86 Total 145 3 3 3 3 Feedback Click Feedback to submit feedback...
Страница 94: ...Unit Installation Page 87 Total 145 UNIT INSTALLATION...
Страница 98: ...Unit Installation Page 91 Total 145 3 Service Tools Name Picture Spanner Screw Driver Pliers Tube Tongs...
Страница 103: ...Unit Installation Page 96 Total 145 4 4 Outline Dimension of Outdoor Unit GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 104: ...Unit Installation Page 97 Total 145 GSH 60ERB GSH 80IRB GSH 100IRB...
Страница 112: ...Unit Installation Page 105 Total 145 4 6 4 Outline dimension of indoor unit...
Страница 118: ...Unit Installation Page 111 Total 145...
Страница 125: ...Unit Installation Page 118 Total 145 GSH 80ERB GSH 100ERB GSH 60ERB...
Страница 126: ...Unit Installation Page 119 Total 145 4 11 Wiring of the Terminal Board GSH 60IRB GSH 80IRB GSH 100IRB...
Страница 135: ...Test Operation Troubleshooting Maintenance Page 128 Total 145 TEST OPERATION TROUBLESHOOTING MAINTENANCE...