6.Solder the
pipeline with the
suction and
discharge ports of
the compressor
Solder the connecting
pipe to make them
connected
Note: never let the
flame contact any other
component.
7.Reconnect the
power cords
a)
Tighten the fixing
screw of the power
cord.
b)
Connect the power
cord.
Note: mark the color
of the power cord and
corresponding terminal.
8.Put back the electric heating belt and the discharge temperature sensor etc.
9.Check and
screw back the
plates
a)
Check if the pipe is
well connected.
b)
Check if the parts and
wire well connected.
c)
If there is no
problem, fix the
cover.
80
Содержание MS-E48AIN
Страница 1: ...HIGH POWER MULTI SYSTEM SERVICE MANUAL EN MS E48AIN MS E56AIN Outdoor unit ...
Страница 11: ...CONTROL 1 OPERATION FLOWCHART 6 ...
Страница 13: ...1 2 Heating Operation 8 ...
Страница 47: ... Outdoor unit higher than indoor unit DB DB DB DB 42 ...
Страница 70: ...Malfunction display High Pressure Protection 2 1 65 ...
Страница 87: ...PARTS GUIDE MS E48AIN MS E56AIN DB2 19SB DB3 19SB DB5 16AF HIGH POWER MULTI SYSTEM ...
Страница 88: ...Exploded view of unitMS E48AIN ...
Страница 91: ...Exploded view of unitMS E56AIN ...
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ...Exploded view of distribution box DB5 16AF ...