4 DB MODULE INSTALLATION ......................................................................................... 3 6
4.1
Precaution for Installation .................................................................................................... 36
4.2
Names of Main Parts ............................................................................................................ 36
4.3
Selection of Installation Location ........................................................................................ 3 6
4.4
Outline Dimension and Servicing Space of DB3-16AF ...................................................... 3 7
4.5
Outline Dimension and Servicing Space of DB5-16AF ...................................................... 3 7
4.6
Installation Instruction ......................................................................................................... 38
5
REFRIGERATION PIPING WORK ................................................................................... 4 0
5.1
Allowable Length and Drop Height of Connecting Pipe ..................................................... 4 0
5.2
Dimension of Connecting Pipe ............................................................................................ 4 0
5.3
Connection of Branch Pipe .................................................................................................. 4 0
5.4
Design Requirements for Oil Trap ....................................................................................... 41
5.5
Connection of Outdoor Unit Refrigerant Pipe ..................................................................... 4 3
5.6
Installation of Piping Adapter .............................................................................................. 4 3
5.7
Precaution for Connection ................................................................................................... 4 4
5.8
Leak Test ............................................................................................................................... 46
5.9
Vacuum Operation ................................................................................................................ 46
5.10
Refrigerant Charging ..................................................................................................... 4 7
6
Electrical Wiring Work......................................................................................................... 5 0
6.1
Wiring Connection ............................................................................................................... 50
6.2
Requirements of Power Circuit and Cable ........................................................................... 51
6.3
Ground Requirements .......................................................................................................... 51
6.4
Precautions of Electrical Wiring Work ................................................................................ 51
6.5
Precaution of Laying Wires .................................................................................................. 52
6.6
Electrical Wiring Work for Outdoor Unit ............................................................................ 52
6.7
Electrical Wiring Work for BU Module ............................................................................... 5 3
6.8
Instructions for DIP Switch .................................................................................................. 55
6.9
Electrical Wiring Work for Indoor Unit ............................................................................... 55
7
INSTALLATION OF DRAINAGE PIPELINE ................................................................... 56
Pressure Protection .................................................................... 6 6
Malfunction display: Low
2.2
Pressure Protection ................................................................... 6 5
Malfunction display: High
2.1
FLOW CHART OF TROUBLESHOOTING ...................................................................... 6 4
2
..... 62
Error description .............................................................................................................
1.3
62
Problem Handling ................................................................................................................
1.2
Check before Contacting Maintenance Serviceman ............................................................ 6 1
1.1
.... 61
Troubleshooting ...............................................................................................................
1
...................................................................................................... 61
NCE
MAINTENA
Installation of Protective Layer on Connection Pipe ........................................................... 60
8
Key Points for Condensate Pipe Installation ........................................................................ 56
7.2
Material Quality Requirements for Condensate Pipe .......................................................... 5 6
7.1
ature sensor error ................................................................... 6 9
Malfunction display: Temper
2.7
Malfunction display: Indoor unit water full protection ........................................................ 6 9
2.6
Malfunction display: Communication error ......................................................................... 6 8
2.5
Malfunction display: Current protection .............................................................................. 6 7
2.4
e temperature protection ...................................................... 6 7
Malfunction display: Discharg
2.3
Содержание MS-E48AIN
Страница 1: ...HIGH POWER MULTI SYSTEM SERVICE MANUAL EN MS E48AIN MS E56AIN Outdoor unit ...
Страница 11: ...CONTROL 1 OPERATION FLOWCHART 6 ...
Страница 13: ...1 2 Heating Operation 8 ...
Страница 47: ... Outdoor unit higher than indoor unit DB DB DB DB 42 ...
Страница 70: ...Malfunction display High Pressure Protection 2 1 65 ...
Страница 87: ...PARTS GUIDE MS E48AIN MS E56AIN DB2 19SB DB3 19SB DB5 16AF HIGH POWER MULTI SYSTEM ...
Страница 88: ...Exploded view of unitMS E48AIN ...
Страница 91: ...Exploded view of unitMS E56AIN ...
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ...Exploded view of distribution box DB5 16AF ...