Make sure that the unit has been identified with the relevant product label(s), and
that one label includes the part and serial numbers.
Result
Requirements
Results
The Operating Panel is correctly installed with easy access for maintenance
and replacement of parts.
The Operating Panel is free from scratches, dents or other physical damage.
Free access to all the connectors on the Operating Panel are provided.
All cables are properly mounted with enough slack.
The Operating Panel is properly grounded.
Date and signature:
Visual inspection of the Transceiver Unit
A visual inspection of the Transceiver Unit is required to verify that the unit has not been
physically damaged during the installation.
Prerequisites
The SU90 has been set up with its hardware units connected as specified in the SU90
Installation manual
. The SU90 is turned off. You need the following equipment:
• Multimeter
Procedure
1
Make sure that the unit’s serial number has been recorded in the list of hardware
items.
2
Make sure that the Transceiver Unit is installed in the correct location, and that it is
suitably oriented for easy maintenance and replacement of parts.
3
Make sure that the Transceiver Unit is fully populated with all circuit boards and
modules mounted.
4
Make sure that the physical installation of the unit has been completed.
a
Make sure that the cabinet door can be fully opened for unrestricted access.
b
Make sure that ample space is provided around the unit to allow for
maintenance and replacement of parts.
c
Make sure that the bolts, screws or studs holding the unit are of the correct size.
d
Make sure that the correct flat and shake-proof washers have been used.
e
Make sure that all nuts have been tightened properly.