SG05 I nst allat ion m anual | 3
Con t e n t
1 Syst e m de scr ipt ion ..................................... 5
1.1 General .................................................. 5
1.2 How t o use t his m anual............................. 5
1.3 Soft ware record ....................................... 6
2 I n st a lla t ion ................................................. 7
2.1 I nst allat ion checklist ................................. 7
2.2 Unpacking and handling ............................ 7
2.3 Det erm ine syst em configurat ion ................. 8
2.4 Aut opilot syst em layout ............................. 9
2.5 SG05 Gat eway inst allat ion ....................... 10
2.6 AP24 and AP28 Cont rol unit inst allat ion ..... 11
2.7 RC42 Com pass inst allat ion ...................... 13
2.8 I nt erfacing ............................................ 14
2.9 Sim Net ................................................. 15
3 Spa r e pa r t s ............................................... 1 9
4 Te ch n ica l spe cifica t ion s ............................ 2 1
4.1 Aut opilot Syst em ................................... 21
4.2 AP24 Cont rol Unit ................................... 23
4.3 AP28 Cont rol Unit ................................... 24
4.4 SG05 Gat ew ay ....................................... 25
4.5 RC42 Rat e Com pass ............................... 26
4.6 AT10 Sim Net / NMEA0183 convert er ........... 27
4.7 Sim Net ................................................. 29
Содержание AP24
Страница 5: ...4 SG05 Installation manual 4 8 IP protection 30 ...
Страница 13: ...12 Operation Optional bracket m ounting Figure 2 6 AP24 Bracket mounting Figure 2 7 AP28 Panel mounting ...
Страница 19: ...18 Operation Blank page ...
Страница 28: ...Technical specifications 27 Figure 4 4 RC42 Rate Compass Dimensions 4 6 AT1 0 Sim Net NMEA0 1 8 3 converter ...
Страница 32: ...AP24 28 EVC Volvo IPS Pilot System with SG05 SimNet Volvo Gateway EN Doc no 20223210 Rev A ...