60
007-4564-001
3: Maintenance and Upgrade Procedures
Installing the Side Panels
Follow these steps to install a side panel (see Figure 3-6):
1.
Align the hooks on bottom edge of the side panel over the lip on the bottom edge of
the enclosure.
2. Swing the side of the panel up. Press the top edge of the panel against the enclosure
to ensure that it is properly seated.
Содержание Tezro
Страница 3: ...007 4564 001 iii Record of Revision Version Description 001 July 2003 Original Publication ...
Страница 4: ......
Страница 9: ...Contents 007 4564 001 ix Lithium Battery Compliance Statement 147 Index 149 ...
Страница 10: ......
Страница 14: ......
Страница 16: ......
Страница 22: ......
Страница 42: ...20 007 4564 001 1 Installation and Operation Procedures Figure 1 20 Restart Notifier ...
Страница 44: ......
Страница 68: ......
Страница 81: ...Returning the Workstation to Service 007 4564 001 59 Figure 3 5 Installing the Bezel A B C D ...
Страница 134: ......
Страница 146: ......